Laserfiche WebLink
ameC�iF <br />Secondary Underdrain: <br />No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of underdrain has been completed. <br />Primary Underdrain, <br />An Amec field representative observed the Primary Under drafn construction and placement of the 8 inch PCEP <br />pipe. Approximately 300 feet of pipe was installed during this reporting period. <br />A total of 863 feet of Primary underdrain has been completed. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters: No work during this reporting period. <br />B) Underground Workings <br />During the reporting period exploratory excavation was performed on UG working No. 6019, No. 6030 and No. <br />6051. These sites will continue with excavation into bedrock as remediation Is completed as specified. <br />During this reporting period remediated sites were performed on UG working No. 6047. Sites listed were excavated <br />to practical refusal into rock varying depths depending on the working remediated. The site for each working was <br />then backfilied in 2 foot loose lifts to approximate planned subgrade elevation using the onsite structural fill <br />(excavated material) and `bucket tamped" with the back of the CAT 330 excavator bucket. All backfill material was <br />free of organic material, ice and snow. <br />Confirmatory drilling continued during the reporting period on UG Working No. 6120 and No. 6123. All drill locations <br />were spaced on 4( + / -) foot centers and drilled to specified depth. Exploratory excavation will continue until <br />remediation has been performed. <br />Blasting occurred on UG Working No. 6112 and 6113. Further excavation will continue. <br />Q Highway 67 <br />MHT #2 Is in place and Is working properly. No other work was performed for the existing HWY 67 crossing during <br />this reporting period. <br />If) Storm Water Management <br />A) Best Management Practices (BMP) are being performed. Inspections continue and there have been no <br />issues identified. <br />CQA ACTIVNIES: <br />I) Field Activities: Construction activities and observation of clearing and grubbing, VLF Phase I fill and compaction, <br />underground workings, HWY 67 embankment fill progress observation were some of the tasks performed in the field as <br />required per project specifications. <br />II) Laboratory Activities: Laboratory testing continued (Permeability, Particle Size Distribution, Afterberg Limits, <br />Moisture- Density, gradations and material identifications) were some of the laboratory testing performed during this <br />reporting period as required to project specifications. <br />Page 2 of 6 M LE2 WE 04.20. i 3.doc <br />