Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br />Trapper's approved permit (Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br />the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br />stockpiles proposed for construction during the upcoming year (Map 1). <br />Table 5 -1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br />approximate center of the pile), acres, construction date and volume; which is updated annually. <br />During 2012, Trapper depleted five existing piles; ASH10, F95 -1, F95 -2, F2 -07 and G1 -05 were totally <br />depleted for topsoil replacement. Topsoil piles Al -09, G2 -06, Z1 -09, Z2 -07 and ZTS -4 either had topsoil <br />added or removed from them during stripping and laydown activities. Topsoil stripping and /or laydown <br />work took place in F Pit, Z -Pit, M -Pit, Ash Dump and Horse Gulch areas. <br />At the end of 2012, excluding stockpiles abandoned with the approvals of MR -155 and TR -94, there are <br />60 existing topsoil stockpiles at Trapper affecting 159.1 acres and storing approximately 3,482,911 cubic <br />yards of salvaged topsoil. <br />Presently there are no proposed approximate locations for new topsoil stockpiles in 2013. Trapper is <br />planning to utilize existing topsoil stockpiles for the 2013 reclamation season. <br />GCR/BDN 2/13 <br />[Annual Report\DRMSI2RPT\12TStext5 -0] <br />