My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_PERMIT FILE - C1981019 (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-04-05_PERMIT FILE - C1981019 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:10 PM
Creation date
5/21/2013 1:26:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/5/2013
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PE I'B'S <br />Coal Processing Waste and Non -Coal Processing Waste <br />Not applicable. Colowyo uses dry crushing facility for coal preparation; no coal processing waste, as <br />defined in Rule 1.04 "DEFINITIONS ", is produced from any part of the mining operations. <br />Underground Development Waste <br />Not applicable. Colowyo is not conducting an underground operation. <br />Return of Coal Processing Waste to Abandon Workings <br />Not applicable. No coal processing waste as defined in Rule 1.04 "DEFINITIONS ", is produced from <br />any part of the Colowyo mining operations. <br />2.05.4 Reclamation Plan <br />The reclamation objective of Colowyo is to restore the mined area to a land use capability that will, be <br />equal to or better than that which currently exists or even better than existed pre- mining. Colowyo is the <br />landowner and does not desire to harm the post- mining value of the property, but to the contrary return a <br />financially superior parcel of land that could command a greater market price if sold. The first objective <br />of all reclamation practices is to stabilize the soil, maintain hydrologic and vegetation resources, and to <br />restore the approximate original contour of the mined area. Ultimately, the areas being mined will be <br />returned to their approximate original use as rangeland with watersheds having their approximate pre - <br />mining character. In general, the long term appearance and usefulness of the mine plan area will be <br />similar to that which would have been encountered prior to any mining. <br />From the beginning planning stages of the Colowyo mine, environmental concerns and reclamation <br />concerns and objectives have been an integral part of the mining and reclamation activities. In 1975, two <br />years prior to the commencement of mining, Colowyo contracted with Colorado State University to <br />conduct reclamation studies to develop methods to reestablish native plant species on disturbed lands, and <br />in particular native shrubs. Also included in these studies were: runoff and sediment plots, mulch plots, <br />fertilizer plots, seeding management practices individual species seedings, and species combination <br />seedings. The initial and last progress reports on these studies are included in Exhibit 10, Vegetation <br />Information. <br />The attainment of reclamation goals will be satisfied by implementation of the reclamation plan described <br />below. Colowyo will combine information from existing baseline conditions with modern practices of <br />reclamation technology to assure achievement of the reclamation objectives. The pre- mining condition of <br />the permit area has been characterized through collection of baseline data. After identification of pre - <br />mining conditions, mining and reclamation commenced in 1976 according to the following sequence: <br />(1) Removal of topsoil and vegetation <br />(2) Removal of overburden; <br />(3) Extraction of the coal resource; <br />(4) Backfilling, grading, and re- contouring of the surface to its approximate original contour; <br />(5) Reestablishment of surface drainage patterns; <br />(6) Topsoil Replacement; and <br />(7) Revegetation and restoration of the affected land to the pre- mining land use. <br />Such practices are expected to result in land use capabilities and productivity levels equal to or greater <br />Rule 2 Permits 2.05 -18 Revision Date: 6/11/12 <br />Revision No.: RN -06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.