My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_PERMIT FILE - C1981019 (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-04-05_PERMIT FILE - C1981019 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:10 PM
Creation date
5/21/2013 1:26:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/5/2013
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE z PERMIT <br />Topsoil Removal Plan <br />Prior to any mining related disturbances, topsoil will be removed from the site to be' disturbed as <br />discussed in Section 4.06 and redistributed or stockpiled as necessary to satisfy the needs of the <br />reclamation timetable. <br />Topsoil will be removed in the permit area by large crawler mounted bulldozers, loaders or scrapers as <br />described in Section 2.05.3, Production Methods and Equipment. <br />The sequence and timetable for all topsoil redistribution and revegetation activities is found on the <br />Topsoil Handling Map (Map 28 and 28A). This drawing also shows the location of the topsoil stripping <br />activities for the current term and future terms. <br />A life -of -mine topsoil balance is estimated in Table 2.05 -1, Topsoil Balance As Of December, 2011. <br />The time period during the year when topsoil removal, distribution and revegetation operations take place <br />depends solely on the weather. Generally, topsoil removal and distribution operations will begin in the <br />spring when soil conditions allow the movement of topsoil, and may continue until late fall until weather <br />conditions prohibit any further topsoil handling. Revegetation, typically, will take place during the early <br />spring or fall. <br />The dynamics of the Colowyo operation to prepare regraded areas for topsoil is at times out of sync with <br />the topsoil stripping operation that may vary from 3 inch to 20 foot depths. Typically, the last loads of <br />topsoil hauled into a regraded spoil area will be left in place in a narrow windrow adjacent to the area to <br />be seeded. Since, in the spring of the next year, this is the first topsoil to be respread onto the advancing <br />regraded spoil, the windrow is always left in place for less than one year. The topsoil is protected from <br />wind and water erosion by placement in stable areas and avoidance of drainage bottoms where external <br />erosion might pose a potential threat. The topsoil is left in a rough condition which combined with the <br />natural woody plant material removed with the topsoil successfully controls wind erosion. Due to the <br />temporary nature of the windrows and its function in the yearly direct topsoil haul operation, it is <br />unrealistic to locate them on the Topsoil Handling Maps 28 and 28A. <br />Topsoil in excess of the demands of the direct haul operation to regraded spoil is placed in topsoil storage <br />stockpiles. The topsoil storage stockpiles for the mine plan area are shown on the Topsoil Handling Maps <br />28 and 28A. As can be seen, topsoil stockpiles have been constructed in the permit area to handle material <br />which is in excess of current redistribution needs. The excess topsoil has been removed from the mining <br />boxcut areas, from haul roads and from mine facility locations. The planned contemporaneous stockpiling <br />and reapplication will eliminate the need to move topsoil stockpiles from one area to another prior to <br />reapplication onto graded spoil. <br />Stockpiles are specifically located to avoid erosion from wind and water and additional compaction or <br />contamination. As can be determined from the Topsoil Handling Map (Map 28), all proposed stockpiles <br />are located within stable areas. The piles will be protected from wind erosion by planting a perennial <br />mixture as explained in Section 4.06.3 as soon as conditions allow. Proper seasons of planting will be <br />early spring or late fall. In addition to the planted material, a considerable amount of volunteer growth can <br />be expected to grow on all stockpiled topsoil. <br />External erosion will be controlled through proper location of the stockpiles. No permanent topsoil <br />stockpiles will be placed in a drainage bottom where external erosion might pose a potential threat. <br />Rule 2 Permits 2.05 -11 Revision Date: 6/11/12 <br />Revision No.: RN -06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.