Laserfiche WebLink
Bowie No. 2 Mine <br />Haul Route: <br />Reclamation Cost Estimate RN -3 Page 8 of 312 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY /Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 563.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />600.00 <br />17.00 <br />3.00 <br />20.00 <br />379 <br />1.588 <br />Haul Time: 1.588 minutes <br />Return Route- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY /Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 563.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />min <br />1 <br />600.00 <br />-17.00 <br />3.00 <br />-14.00 <br />1377 <br />0.566 <br />minutes <br />minutes <br />498.74 LCY /Hour <br />281.60 LCY /Hour <br />2 Truck(s) <br />_ LCY /Hour <br />_ LCY /Hour <br />LCY /Hour <br />Fleet size: 1 Team(s) Total job time: 609.56 Hours <br />Unit cost: $1.331 /LCY Total job cost: $404,650.02 <br />Return Time: 0.566 <br />Total Truck Cycle Time: 7.474 <br />Loading Tool unit <br />Production 600.89 <br />LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />339.28 <br />LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 563.20 <br />Adjusted single truck/loader team production: 498.74 <br />Adjusted multiple truck/loader team production: 498.74 <br />JOB TIME AND COST <br />minutes <br />minutes <br />498.74 LCY /Hour <br />281.60 LCY /Hour <br />2 Truck(s) <br />_ LCY /Hour <br />_ LCY /Hour <br />LCY /Hour <br />Fleet size: 1 Team(s) Total job time: 609.56 Hours <br />Unit cost: $1.331 /LCY Total job cost: $404,650.02 <br />