Laserfiche WebLink
• Monitor compaction lifts, compaction equipment in conjunction with contract soils Formatted: Font: 11 pt <br />engineer. <br />• Soils engineer to observe, segregate suitable embankment material, and test placement of <br />embankment fill during construction. <br />Clay Material Segregation, Sub Base Construction, and Gco,ynthcUc Clay Liner <br />ln,tallaUonr „n • Performed by contractor, monitored by Mill Superintendent and /or Owner's Engineer. <br />• Soils engineer to segregate suitable clay for sub base as ree ulred4ne i; t4ef+t r while <br />observing placement of embankment fill during construction. <br />• Grade top of suh ba,, t IR)r lifrei- on interior slope and bottom of impoundment ( +/- I”) on <br />50' grid. - • Monitor rkry I+nersub basr. ems, compaction equipment in conjunction with <br />contract soils engineer. <br />• Suh base is compacted on -site soils to 9515 standard proctor. +/- 2ch optimum moisture. <br />• Finished surface shall be firm and Unyielding, �lding, Xs Ithout abrupt elevation changes, voids, <br />cracks, ice or standing water <br />• Liner material contractor gill inspect the sub ba,e prior to commencing installation <br />• Soils eRg:ReeF to test placement of clay liner aEt ap duFiRg nSt. <br />• On n,i a f ' cnr' Liner material <br />contractor will install and te,t the geo,�nthcuc clan liner in accordance with <br />manufacture's recommendation,.. <br />• The liner material contractor \N ill inspect a known perched aquifer seep approximately <br />four -ft above the bottom of the TSF floor and employ one of the techniques belo�N. or <br />equi,alent,to minimize premature hydration when layim�g =eosynthet:c clay liner oNer <br />- <br />the seep area. <br />• No special procedures: <br />Seep has minimal flow (damp, dry) or the seep flow -is controllable with F <br />standard pumping techniques, (- nummving standing «atcr) and no <br />additional liner installation techniques required <br />• vi,clueen liner below seep: <br />• Seep flow is controllable with standard pumping techmque,(minimizing <br />standing water), but flow from the seep ma? cause hydration of the <br />-cos clay liner below the seep faster than desired. <br />• Visgueen or equity alent liner placed from the seep to the TSF floor, <br />reducing hydration of the GCL material and directing seep flow to the <br />TSF floor for control by standard pumping technique <br />• Subdrain along seep: <br />• Seep flow i, not controllable n ith standard pumping techniques <br />(standinL, \,,atcr). <br />• Installation of suhdram along seep, directing water from seep to an <br />infiltration area within the TSF ,tructUrc a, shown in Figure C -7, <br />Subdrain Detail and Figure C -3, Subdrain Location. <br />i <br />M1990 -057 -` teas Alav 14, 2013!, <br />M Font: 11 pt <br />Font: 11 pt <br />Font: 11 pt <br />Font: 11 pt <br />Formatted: Font: 11 pt <br />Formatted: Font: 11 pt <br />Formatted: Font: 11 pt <br />Formatted: Font: 11 pt <br />Formatted: List Paragraph, Left, Space Before: <br />0 pt, After: 0 pt <br />Formatted: Font: 11 pt <br />Formatted: Font: Times New Roman <br />Formatted: Font: Times New Roman <br />Formatted: Font: Times New Roman <br />Formatted: List Paragraph, Left, Space Before: <br />0 pt, After: 0 pt <br />Formatted: Font: Times New Roman <br />Formatted: List Paragraph, Left, Space Before- <br />0 pt, After: 0 pt <br />Formatted: Font: Times New Roman <br />Formatted: Font. Times New Roman <br />Formatted: Font: Times New Roman <br />Formatted: List Paragraph, Left, Space Before: <br />0 pt, After: 0 pt <br />Formatted: Font: Times New Roman <br />Formatted: List Paragraph, Left, Space Before: <br />0 pt, Aker: 0 pt <br />Formatted: Font: Times New Roman <br />Formatted: Font: Times New Roman <br />Formatted: Font: Times New Roman <br />oFormatted: Font: Times New Roman <br />Font Times New Roman <br />Font: Times New Roman <br />Font. Times New Roman <br />Formatted: Font 10 pt, Bold <br />Formatted: Right <br />Formatted: Font: 10 pt, Bold <br />