My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-20_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2013-05-20_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:34 PM
Creation date
5/20/2013 1:24:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
5/20/2013
Doc Name
SHPO Correspondence Letter (Emailed)
From
DRMS
To
BLM
Type & Sequence
PR2
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tiyKI`KI <br />'1. <br />COLORADO <br />1A <br />State.co.us Executive Branch Mail - Fwd: McClane Canyon Mine <br />Hi Alysha /Mary: <br />Please file this e-mail correspondence in laser fiche under McClane Canyon Mine Permit No. C- 1980 -004, Permit <br />Revision No. 2. Thank You. <br />Hi Christina: <br />Thanks for the update on Friday regarding the McClane Canyon Mine Lease Modification EA. You <br />indicated that a signed Decision for the EA will be forthcoming. Per our conversation I still have one <br />remaining item that needs to come to resolution before DRMS can propose its decision for Permit Revision <br />No. 2 regarding the permit boundary expansion for the lease modification. As you know the operator pulled <br />all of the surface facilities and any associated new disturbance from the original PR -2 proposal. Consultation <br />under Section 106 of the National Historic Preservation Act was initiated for this project and is still in <br />progress by the Federal agencies that are involved (see attached letter from SHPO to the BLM dated <br />December 10, 2010). I understand that some additional data was collected to complete the analysis and the <br />project is still under review. Alissa Leavitt- Reynolds of your staffhas replaced Aline LaForge whom <br />originally reviewed the proposal. Could you please give me an update on the status of this work. I will <br />need to make a Findings regarding the outcome of this consultation and cannot proceed further without final <br />correspondence from the BLM & SHPO. I really appreciate all of your work on this project to date and <br />look forward to hearing from you regarding this matter. Thank You <br />Mike <br />Michael P. Boulay, P.C. <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />(970) 243 -1571 <br />mike.boulaystate.co.us <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &�iev�-- pt &search =i nbox&th= 13ec2c78f7l d91 fe 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.