Laserfiche WebLink
areas on June 6th _ 9th, 2011, and May 29th — June 2"d, 2012. In addition to the sampling effort, current <br />conditions existing at the time of field work were documented by photos of several representative areas <br />and the reference areas to provide a visual demonstration of site - conditions (Photo Plates 1 — 28 in <br />Appendix A). In order to maximize the representation of all sites, and minimize the issue of extreme <br />variation within and among sites due to the inherent structure of vegetation communities, a larger <br />number of samples were collected from each of the two units. In this manner, a more commensurate <br />sampling gives an evenly weighted representation of site characteristics and thus, a high level of <br />confidence in the data. The evaluation was conducted by or under the direct supervision of Cedar <br />Creek's Senior Plant Ecologist, Mr. Erik M. Mohr. <br />CEDAR CREEK ASSOCIATES, Inc. Page 2 Snowcap - Phase III Bond Release <br />Evaluation - 2012 <br />