Laserfiche WebLink
Exhibit G — Water Information (amended) <br />24.) Mining will be done to the North of Surveyor Creek. We do not want to mine material from the Creek <br />bed. All maps included in this permit application show the proposed affected area as being outside the banks of <br />the Surveyor Creek. <br />25.) In order to retain stability of the affected areas and prevent stormwater runoff from entering the Surveyor <br />Creek, we will a.) mine from the south to the north, pushing all material into a stockpile near the actual truck <br />parking area closest to the pit entrance. This will create a natural barrier that will stop Stormwater runoff from <br />entering the creek. And b.) We will create a berm along the south end of the proposed area, at the top of the <br />north and east banks of the Surveyor Creek that will act as a dam for Stormwater runoff. <br />