Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M -88 -112 <br />April 2013 Monthly Report <br />Page 2 <br />Table 1- April 2013 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site <br />Date <br />Depth to Water (feet) <br />M-4R <br />4/30/13 <br />0 <br />M -6 <br />4/30/13 <br />Dry <br />M -7 <br />4/30/13 <br />Dry <br />M -8 <br />4/30/13 <br />Dry <br />M-9 <br />4/30/13 <br />141.78 <br />M -10 <br />4/30/13 <br />26.53 <br />M -11 R <br />4/30/13 <br />39.54 <br />M -12 <br />4/30/13 <br />176.08 <br />M -13R <br />4/30/13 <br />127.06 <br />M -14 <br />4/30/13 <br />132.28 <br />M -15 <br />4/30/13 <br />92.66 <br />M -16 <br />4/30/13 <br />22.91 <br />M -19 <br />4/30/13 <br />23.21 <br />M -21 <br />4/30/13 <br />17.32 <br />M -22 <br />4/30/13 <br />15.83 <br />M -26 <br />4/30/13 <br />15.77 <br />M -32 <br />4/30/13 <br />42.24 <br />M -33 <br />4/30/13 <br />48.49 <br />M -34 <br />4/30/13 <br />23.97 <br />BF4 <br />4/30/13 <br />24.85 <br />BF -6 <br />4/30/13 <br />30.83 <br />LS -1 <br />4/30/13 <br />Dry <br />LS -2 <br />4/30/13 <br />Dry <br />LS -3 <br />4/30/13 <br />Dm <br />LD -1 <br />4/30/13 <br />Dry <br />LD -2 <br />4/30/13 <br />Damaged <br />LD -3 <br />4/30/13 <br />Dry <br />Table 2 — April 2013 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water Total Depth (ft) Volume of <br />(feet) Water (ft) <br />P6 <br />4/30/13 <br />Dn, <br />72.46 <br />0.00 <br />P7 <br />4/30/13 <br />92.26 <br />92.50 <br />0.24 <br />P8 <br />4/30/13 <br />96.92 <br />97.51 <br />0.59 <br />P9 <br />4/30/13 <br />71.86 <br />72.30 <br />0.44 <br />