Laserfiche WebLink
El -t ibit E page 2 of 2 <br />No overburden will be stripped due the material is <br />silty deposited into an existing pond and is only a <br />clean out of a pond. <br />6" of Top soil on average to be spread out <br />over the area of the stockpile area and <br />topsoil area. Ground to be ripped or <br />scarified to prep before seeding. No seed <br />will be needed within the pond area. Any . <br />other ground within the permit boundary <br />that was compacted or vegetation <br />destroyed will be scarified and seeded in <br />the same manner as the stockpile area, <br />other than the inside of the pond. No <br />shrubs or trees will be planted. <br />i <br />Plan View of Lost Cause Reclamation Plan <br />(Not to Scale) <br />4. <br />Top of darn <br />2;1 slope on the inside of dam face <br />to the bottom of the pond. <br />3:1 slopes from the edge of the pond also known as <br />the shore line. <br />Permit boundary <br />*This map is to used in conjunction ivdth die <br />Lost Cause Nine, Plan neap shoving section lines <br />and legal descripixons. <br />