My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-02_REVISION - M1980055HR
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980055
>
2013-05-02_REVISION - M1980055HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:28 PM
Creation date
5/14/2013 10:30:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980055HR
IBM Index Class Name
REVISION
Doc Date
5/2/2013
Doc Name
Installation of Groundwater Monitoring Wells May 2013
From
ENERGY FUELS RESOURCES
To
DRMS, BLM
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL CONSTRUCTION AND PUMP INSTALLATION BY THE WELL OWNER <br />You may construct the well and/or install the pump yourself if the well is for your own use, is on property <br />you own, and is constructed or pumping equipment is installed with equipment owned and operated by you. It is <br />your responsibility to complete and submit the Well Construction and Test Report, Form Number GWS -31 and/or <br />the Pump Installation and Test Report, Form Number GWS -32. These forms are available from our offices. The <br />webs be cons -u ed -aid tine pump- fnstalletl tn� rdar� h the welt construction s arus of Tthe State- <br />Board of Examiners of Water Well Construction and Pump Installation Contractors. • <br />The Water Well Construction Rules are available from Division of Water „Resources,offices for,a'fee.of $5.00. <br />The Rules cover the-minimum requirements for well construction, pump installation, disinfection, plugging and <br />sealing' and include contractor licensing regulatio'ns'.' If you are constructing your own well or installing pumping <br />equipment, it is recommended that you obtain a copy of these Rules for reference. <br />RULE 12 WELL TESTING <br />12.1 General - The provisions of this rule establish minimum standards for the testing of water wells. Every <br />we�rcons�rucTebr th p� �r�os� of proucing ground mater s1�a1J Ise testeid to fief merri e: <br />a. a stabilized yield for the well; and <br />b. the production rate of the equipment installed when the well is placed into service. <br />12.2 Well Yield Test - The yield of a' well shall 'be determined as a stabilized production rate where the <br />'-withdrawal rate and the draw down do not change by more than 0.6/o during the iasc hour of the test. The test <br />shall demonstrate that.e'ither: - <br />a. the well is capable of producing the permitted pumping rate for the well; or <br />b. that the maximum yield of the well is less than the permitted production rate. <br />Responsibility for Well �'Aeld Test Well eonstruetion eontraetors are responsible for perfonrAng the <br />well yield test and submitting the test data to the State Engineer. If the construction contractor also installs the <br />production equipment, the well yield test may be combined with the production equipment test, provided that the <br />test meets the requirements of Rule 12.2. The construction contractor may forgo the well yield test if he can <br />show that a licensed pump installer will perform the well yield test with the permanent production equipment <br />within thirty (30) -days of completion of construction of the well. If the pump installation contractor performs the <br />well yield test; he/sheshall:submitthe-test information on- the:Rump,lnstallation' and Test - Report.' <br />12.4 "Production Equipmer�t•Test -. The pioductipr� equipmeni;installed�in wells shall be tested to ensure it <br />is functigning'as designed.- ' The test, shall, demonstrate -the production • capacity of the equipment as actually <br />ins in -the well. it is respons� i i -moo the person installing _ e_ pumping- system 'to-ensure that the <br />production from the well complies with the conditions of the permit. <br />12.5 Responsibility for Production Equipment Test Pump installation contractors are responsible for <br />testing the production equipment installed in a well upon completion of their work. If the well construction <br />contractor determined the well yield and submitted a report, the pump installer need not perform another well <br />yield test. If the pump installer does not perform a well yield test with the permanent production equipment, he <br />shall perform a' production equipment test and report the data (results) -to the State Engineer on the Pump <br />I nstallation and Test Report. <br />Wells to be plugged and sealed must be plugged in accordance with of the Water Well Construction <br />Rules. A Well Abandonment Report, form number GWS -9 must be submitted to confirm plugging and sealing of <br />the well. This form is available from our offices. The general Rule for plugging and sealing wells is printed below. <br />The specific rules are found on the reverse side of the Well Abandonment Report form. <br />RULE 16 STANDARDS FOR PLUGGING AND SEALING WELLS AND WELL EXCAVATIONS <br />16.1 General - The plugging, sealing and abandonment of all wells, monitoring and observation wells, <br />monitoring and observation holes,and test holes that are no longer intended for use, and•the- plugging, sealing; <br />and abandonment of dry, holes,' collapsed or unusable boreholes,.and other_ incomplete. wells or excavations is <br />necessary..'to prevent - contamination of groundwater and the- migMbq n faf:water- thrqugh�the- borehole. • - It - is .the, <br />ultimate res nsibif of the well` owner to have an existing well properly � hugged, sealed and abandoned. The <br />well construction contractor,'or.authorized, dividual as -responsible-fdr=tify % the well dwner in writing of these <br />plugging requirements.-- _ =j ;:, M,.. -.• <br />
The URL can be used to link to this page
Your browser does not support the video tag.