Laserfiche WebLink
Form No. OFFICE OF THE STATE ENGINEER <br />GWS -25 COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 866 -3581 <br />DENISON MINES (USA) CORP <br />1050 17TH ST, SUITE 950 <br />DENVER, CO 80265- <br />(303) 628 -7798 <br />WELL PERMIT NUMBER 287946 <br />DIV. 7 WD 71 DES. BASIN MD <br />AUTH <br />APPROVED WELL LOCATION <br />SAN MIGUEL COUNTY <br />NE 1/4 NW 1/4 Section 10 <br />Township 44 N Range 18 W New Mex P.M. <br />DISTANCES FROM SECTION LINES <br />Ft. from Section Line <br />UTM COORDINATES (Meters,Zone:13,NAD83) <br />Easting: Northing: <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief in a civil court action. <br />of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br />Contractors in accordance with Rule 18. <br />3) Approved pursuant to CRS 37- 92- 602(3)(b)(1) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to <br />monitoring water levels and /or water quality sampling. <br />4) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. <br />The well must be kept capped and locked at all times except during sampling or measuring. <br />5) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to <br />the Division of Water Resources upon request. <br />Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br />Resources within 60 days of plugging. <br />7) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, <br />and shall take necessary means and precautions to preserve these markings. <br />8) This well must be constructed by or under the supervision of a licensed well driller or other authorized individual according <br />to the Water Well Construction Rules. If non - standard construction is anticipated, a variance request must be submitted in <br />accordance with Rule 18 and approved prior to well construction. <br />9) A Well Construction and Test Report (Form GWS -31), including lithologic log must be submitted by the individual <br />authorized to construct the well. For non - standard construction, the report must include an as -built drawing showing <br />details such as depth, casing, perforated zones, and a description of the grouting type and interval. <br />10) Pursuant to Rule 6.2.3 of the Water Well Construction Rules, the well construction contractor shall submit the as -built well <br />location on work reports required by Rule 17.3 within 60 days of completion of the well. The measured location must be <br />accurate to 200 feet of the actual location. The location information must include a GPS location (UTM coordinates) <br />pursuant to the Division of Water Resources' guidelines. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br />permit. Additionally, pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes <br />constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br />the State Engineer, a monitoring hole may be converted to a onitoring well, recovery well for remediation of the aquifer, or <br />a-- <br />APPROVED <br />JST <br />State Engineer By <br />Receipt No. 9703236 DATE ISSUED 04 -11 -2012 TION DATE 04 -11 -2014 <br />