My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M1977193 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2013-05-10_REVISION - M1977193 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:58 PM
Creation date
5/13/2013 7:49:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
Preliminary Adequacy Review Reponse.
From
Azurite, Inc.
To
DRMS
Type & Sequence
AM5
Email Name
TC1
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />(f) A description of each of the following: <br />(i) Final grading - specify maximum anticipated slope gradient or expected ranges <br />thereof; <br />Final grades in the highwall area will be 0.25:1 with 40' vertical runs and 30' wide benches. Rock <br />faces will be left as rock outcrop with benches graded to toe of vertical face at 5% slope. Final grades <br />within topsoiled main pit area will be kept at 3:1 where possible. Final grades of storm water <br />detention pond area north of mining area will be 3:1 on outslope of sediment ponds. Rip- rapped <br />inlets and spillways from one sediment pond to another in the system may have slopes up to 2:1. <br />(ii) Seeding - specify types, mixtures, quantities, and expected time(s) of seeding and <br />planting; <br />Mixtures will be a minimum of ten species from the list of grasses, shrubs, and tree species on page <br />2 -3 of this Exhibit, based on price and availability at the time of purchase. The operator will attempt <br />to include at least four species of woody stem plants in each seed mixture. <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />It is assumed that a one -time initial application of app. 100 # / acre Nitrogen and 80# /acre Phosphorus <br />will be necessary at the time of first seeding, although these amounts may be adjusted after soil <br />analysis is performed prior to seeding of the site. It is not assumed that subsequent inorganic fertilizer <br />applications will be necessary unless called for by future soil analysis or lack of vegetative success. <br />(iv) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; and <br />No plantings of tree or shrub seedlings are planned for at this site. Seeding of woody plant species <br />including tree species will be included with overall seed mixture. Emerging woody plant species may <br />need maintenance such as removal of competing grasses in the area directly adjacent to the woody <br />plant and mulch application around young woody plants to promote moisture retention and plant <br />growth. <br />(v) Topsoiling - specify anticipated minimum depth or range of depths for those areas <br />where topsoil will be replaced. <br />Plans for topsoiling will include the final pit floor configuration at a depth of between 12 " -18 ". <br />Topsoiling will be performed beginning no earlier than 2050 or when final pit elevation is reached in <br />area not being utilized for stockpiling or loading of finished product. <br />configuration <br />2057-2077 <br />Final pit floor elevation attained <br />2077-2082 <br />Main pit area topsoil /plant medium <br />Pit floor revegetation <br />hauled to main pit area, revegetation <br />initiated at southern end <br />of main pit area begins <br />of lower pit, then <br />moving northward <br />(f) A description of each of the following: <br />(i) Final grading - specify maximum anticipated slope gradient or expected ranges <br />thereof; <br />Final grades in the highwall area will be 0.25:1 with 40' vertical runs and 30' wide benches. Rock <br />faces will be left as rock outcrop with benches graded to toe of vertical face at 5% slope. Final grades <br />within topsoiled main pit area will be kept at 3:1 where possible. Final grades of storm water <br />detention pond area north of mining area will be 3:1 on outslope of sediment ponds. Rip- rapped <br />inlets and spillways from one sediment pond to another in the system may have slopes up to 2:1. <br />(ii) Seeding - specify types, mixtures, quantities, and expected time(s) of seeding and <br />planting; <br />Mixtures will be a minimum of ten species from the list of grasses, shrubs, and tree species on page <br />2 -3 of this Exhibit, based on price and availability at the time of purchase. The operator will attempt <br />to include at least four species of woody stem plants in each seed mixture. <br />(iii) Fertilization - if applicable, specify types, mixtures, quantities and time of application; <br />It is assumed that a one -time initial application of app. 100 # / acre Nitrogen and 80# /acre Phosphorus <br />will be necessary at the time of first seeding, although these amounts may be adjusted after soil <br />analysis is performed prior to seeding of the site. It is not assumed that subsequent inorganic fertilizer <br />applications will be necessary unless called for by future soil analysis or lack of vegetative success. <br />(iv) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; and <br />No plantings of tree or shrub seedlings are planned for at this site. Seeding of woody plant species <br />including tree species will be included with overall seed mixture. Emerging woody plant species may <br />need maintenance such as removal of competing grasses in the area directly adjacent to the woody <br />plant and mulch application around young woody plants to promote moisture retention and plant <br />growth. <br />(v) Topsoiling - specify anticipated minimum depth or range of depths for those areas <br />where topsoil will be replaced. <br />Plans for topsoiling will include the final pit floor configuration at a depth of between 12 " -18 ". <br />Topsoiling will be performed beginning no earlier than 2050 or when final pit elevation is reached in <br />area not being utilized for stockpiling or loading of finished product. <br />
The URL can be used to link to this page
Your browser does not support the video tag.