My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-09_HYDROLOGY - M2009048
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2009048
>
2013-05-09_HYDROLOGY - M2009048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:19 PM
Creation date
5/10/2013 10:16:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009048
IBM Index Class Name
HYDROLOGY
Doc Date
5/9/2013
Doc Name
SWSP
From
OSE
To
Grand Junction Pipe & Supply Company
Permit Index Doc Type
Hydrology Report
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM "A'- <br />A. GENERAL. OBLIGATION -- BENEFITS CONDITIONED UPON PAYMENT <br />(a) The obligation of the Contractor to pay the united States as provided in this contract <br />is a general obligation of the Contractor notwithstanding the manner in which the obligation may <br />be distributed among the Contractor's water users and notwithstanding the default of individual <br />water users in their obligation to The Contractor. <br />(b) The payment of charges becoming due pursuant to this contract is a condition <br />precedent to receiving benefits under this contract. The united States shall not make water <br />available to the Contractor through the Colorado River Storage Project, Aspinall Storage Unit <br />facilities during any period in which the Contractor is in arrears in the advance payment of water <br />rates due the United States. The Contractor shall not deliver water under the terms and <br />conditions of this contract for lands or parties that are in arrears in the advance payment of water <br />rates as levied or established by the Contractor. <br />B. NOTICES <br />Any notice, demand, or request authorized or required by this contract other than as addressed in <br />Article 2 (b) above shall be deemed to have been given on behalf of the Contractor when mailed, <br />postage prepaid, or delivered to the Regional Director, Upper Colorado Region, Bureau of <br />Reclamation, 125 South State Street, Room 6107, Salt Lake City, Utah 84138 -1102 to the <br />attention of t�C-44-5 and on behalf of the United States when mailed, postage prepaid, or <br />delivered to the Contractor at P.O. Box 1849, Grant Junction Colorado 81052 to the attention of <br />I, an Geer. The designation of the addressee or the address may be changed by notice given in <br />the same manner as provided in this article for other notices. <br />C. CONTINGENT UPON APPROPRIATION OR ALLOTMENT OF FUNDS <br />The expenditure or advance of any money or the performance of any obligation of the United <br />States under this contract shall be contingent upon appropriation or allotment of funds. Absence <br />of appropriation or allotment of funds shall not relieve the Contractor from any obligations under <br />this contract. No liability shall accrue to the United States in case funds are not appropriated or <br />allotted. <br />1). OFFICIALS NOT TO BENEFIT <br />No Member of or Delegate to the Congress, Resident Con tnissioner, or official of the Contractor <br />shall benefit from this contract other than as a water user or landowner in the same manner as <br />other water users or landowners. <br />
The URL can be used to link to this page
Your browser does not support the video tag.