Laserfiche WebLink
F----- - - - - -- <br />II <br />1' <br />I <br />11 <br />i <br />I <br />iI <br />i <br />,,`,3Si IIIII, <br />:yV <br />.• s.. <br />'�•., AND P • ,,��' 1 <br />,'fill111T�, <br />II <br />FOUND BRASS CAP <br />BEING THE <br />SOUTHWEST CORNER I <br />OF SECTION 24, <br />TOWNSHIP 1 SOUTH, <br />RANGE 100 WEST OF J <br />THE 6TH PRINCIPAL <br />MERIDIAN <br />Ertl Family Partnership <br />Parcel No. 163723100304 <br />i <br />PROPOSED MINE <br />AREA BOUNDARY <br />i <br />200' Offset of Affected Area <br />Iv� <br />N53 °1 <br />iiil��y`; \� <br />MINE ENTRANCE r• <br />(/ <br />LATITUDE: ' , I it I �,�` •I _ ' <br />r 34'04.62375"W <br />V. <br />l1 <br />\ <br />PROPOSED MINE <br />AREA BOUNDARY <br />I <br />,1 <br />i <br />O <br />S <br />w T <br />I �y <br />ti0 w 1 j 200.00' --I 0 <br />X` <br />1 <br />200.00 <br />9 <br />El Paso Production Oil & Gas <br />USA, L.P. 19 890 <br />Parcel No. 163725100005 <br />LEGEND 3� , Z o <br />IN, Existing Ground Contours \ Sr m m to <br />\ FOUND BRASS CAP a- c <br />Proposed Reclaimation \ BEING THE SOUTH <br />Ground Contours \ \ QUARTER CORNER <br />\ OF SECTION 24, <br />100 ° 100 200 \ TOWNSHIP 1 SOUTH, <br />RANGE 100 WEST OF <br />GRAPHIC -100 FEEN FEET THE 6TH PRINCIPAL I <br />CONTOURINTERVAL =2 FEET \ MERIDIAN <br />Duck Creek Mine <br />Mine Reclaimation Plan <br />SCALE: 1- = 100' I I DATE: April 25,1013 1 DRAWN BY: SMG <br />SHEET: 2 of 12 PROJECT: 10753 1 CHKD BY: M1G <br />DP, AWING: Duck CrwithningPlan- 8reur.dwg <br />DI R ECTOPY: I : \GVWF \10753\SubmiBal\20130425\ <br />Shale Tech Inteniational Services <br />GAMBA & ASSOCIATE'S, INC. <br />CONSULTING ENGINEERS & LAND SURVEYORS <br />970/945 -2550 WWW.GAM13AENGINEERING.COM <br />113 IIITK ST., STC. 211 1.0. BOX 1150 GI- 00D SPRINGS, CO 81602 <br />Q� <br />� �0 e Quo <br />I �P <br />SHEET NO. <br />E2 <br />