My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - M1977451 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977451
>
2013-04-15_REVISION - M1977451 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 10:00:29 AM
Creation date
5/8/2013 2:50:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977451
IBM Index Class Name
REVISION
Doc Date
4/15/2013
Doc Name
RESPONSE TO ADEQUACY REVIEW #1
From
COTTER
To
DRMS
Type & Sequence
AM1
Email Name
KAP
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to DRMS Adequacy Review (1) -Cotter SR -11 Mine Reclamation Plan Amendment <br />offsite surface runoff around the waste pile and captures and contains onsite <br />runoff from a 10 -year 24 -hour precipitation event. <br />14. Addressing Rule 6 4.21 (14) - On Page U17 of the EPP, SPLP tests were conducted in <br />order to characterize the waste rock generated at this site. According to this rule, the ore <br />must also be characterized. Please submit to the Division, a geochemical evaluation of <br />the ore to be mined Alternatively, if ore samples are not available at this time, commit to <br />submitting this information to the Division, for review and approval, prior to any <br />stockpiling on the surface. <br />Prior to ore being stockpiled on the surface, Cotter will submit to DRMS a <br />geochemical evaluation of the ore to be mined for its review and approval. <br />15. Addressing Rule 6.4.21(16), on page U -20, the EPP states that design and <br />implementation of the Drainage Design Plan will be overseen by a registered <br />professional engineer. Please commit to submitting an "As Built Certification" to the <br />Division following construction. <br />Cotter will submit an "As- Built- Certification" to the Division following the <br />construction of the Drainage Design Plan facilities. <br />16 Addressing Rule 6.4.21(16), on page U -20, the EPP states that Cotter Corp. will conduct <br />regular inspections of all structures. Please inform the Division of the anticipated <br />minimum inspection frequency interval. <br />Cotter will at a minimum inspect all structures once per week when the mine <br />is active and once per month when the mine is inactive. <br />17. Addressing Rule 6.4.21(18)(b), please describe the measures Cotter Corp. intends to take <br />to prevent wildlife from coming into contact with uranium, uranium by-products or any <br />other radionuclides. <br />Please see Cotter's response to question #8 above. <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.