Laserfiche WebLink
U <br />2 <br />a <br />N <br />N <br />0 10 20 40 <br />SCALE: 1 " = 20' <br />AT CESSATION OF MINING AS A PART OF <br />FINAL RECLAMATION: REMOVE PORTION OF POND <br />EMBANKMENT AS SHOWN TO ALLOW COMPLETE <br />DRAINAGE OF RETENTION POND. RECLAIM <br />DISTURBED AREAS IN ACCORDANCE WITH <br />SPECIFICATIONS PROVIDED FOR SITE RECLAMATION. <br />AN ALTERNATIVE POND RECLAMATION SHALL BE <br />TO BACKFlLL POND WITH NATIVE MATERIAL AND <br />GRADE SURFACE TO DRAIN <br />EXISTING STORMWATER <br />RETENTION POND 30 <br />C)" <br />EXISTING <br />STRUCTURE <br />C <br />r, <br />l <br />Sv75` <br />Iti � <br />tu REVISION ® RLC DATE 4/30/2013 DRAWN BY RLC DATE 7/20/2012 (�/ �J %.`�,y 2350 G Road RETENTION POND 30 - POST RECLAMATION <br />REVISION &- DATE DESIGNED BY PMO DATE 7/2012012 O'Connor (Des n �roup Inc Grand Junction, Co. 81505 CONFIGURATION <br />U REVISKIN ®_ DATE CHECKED BY PALO DATE 7/20/2012 (((JJJ • Phone:(970)241 -7125 <br />Fax: (970) 241 -7852 COTTER CORPORATION MINE SM -18 SHEET 11 DF 11 <br />