Laserfiche WebLink
N <br />0 10 20 40 <br />SCALE 1 " = 20' <br />AT CESSATION OF MINING AS A PART OF <br />FINAL RECLAMATION: REMOVE PORTION OF POND <br />EMBANKMENT AS SHOWN TO ALLOW COMPLETE <br />DRAINAGE OF RETENTION POND. RECLAIM <br />DISTURBED AREAS IN ACCORDANCE WITH <br />SPECIFICATIONS PROVIDED FOR SITE RECLAMATION <br />AN ALTERNATIVE POND RECLAMATION SHALL BE <br />TO BACKFILL POND WITH NATIVE MATERIAL AND <br />GRADE SURFACE TO DRAIN <br />EXISTING STORMWATER <br />RETENTION POND 10 <br />50-3 <br />REVISION & RLC DATE 4130/2013 DRAwN By RLC DATE 7/20/2012 . 2350 G Road RETENTION POND 10 - POST RECLAMATION <br />7/20/2012 Grand Junction, Co. 81505 <br />�A� ®— DATE DESIGNED By �- DATE e*.Y roup Inc• Phone: (970), Co. 8 5 CONFIGURATION <br />REmstoN ®_ DATE CHECKED By PMO DATE 7/20/2012 <br />Fax: (970) 241 -7852 COTTER CORPORATION MINE SM -18 SHEET 9 of 11 <br />