Laserfiche WebLink
V. <br />r � <br />RE UIRED LAKE COUNTY BUILDING INSPECTIONS <br />1. Footer and Foundation Inspection: To be made after trenches are <br />excavated and forms onrtheejob. WheereaconcreCeifrom ar central umix- <br />tion are delivered j <br />ing plant (commonly termed "transit mixed ") is to be used, mate' <br />rials need not be on the job. <br />2. Frain „� ection: To be made after the roof, all framing, fire - <br />blocking, and bracing are in place and all pipes, chimneys and <br />all vents are complete. After rough electrical. <br />3. Lath and /or Wallboard Inspection: To be made after a11 lathing <br />But before place <br />and /or watlboard, intliedrornbe forer wallboard njoints; and fasteners ad exteior, is <br />any plastering is app <br />are taped and finished. <br />4. Final Ins ecp tion: To t�, naldelectrical building besdone� .leted and <br />ready for occupancy. <br />Other In actions: In addition to the required inspections spec- <br />ified above, the Building Official may make or require <br />lianceother <br />inspections of any construction work to ascertain comp with <br />the provisions of this Code and other laws which are enforced by <br />the Building Department. <br />Make a drawing of your Ispecify whichiproperty line hisffront, <br />side and rear property lines. <br />A sn, <br />the name of the frontage r�dtheir usechsiae andnlocation on <br />indicate all pre-existing structures, <br />the site. Indicate location of proposed new construction. A complete <br />set of blue prints are required with application. <br />I hereby acknowledge that I have read this application and state that <br />information given is correct and agree not to start this project until <br />this application is approved and permit issued. I understand that I <br />must give a 24 hour,notice on all required phases of construction. <br />Date of Application 1a)e.�st APPLICANT'S SIGNATURE <br />C <br />