My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-02_PERMIT FILE - M2013026 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013026
>
2013-05-02_PERMIT FILE - M2013026 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:08 PM
Creation date
5/8/2013 11:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013026
IBM Index Class Name
Permit File
Doc Date
5/2/2013
Doc Name
New 110(2) Application, Part 1
From
Lockland, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />t . <br />I <br />. l <br />REQUIRED LAKE COUNTY BUILDING INSPECTIONS <br />1. Footer and Foundation Inspection: To be made after trenches are <br />excavated and forms erected and when all materials for the founda- <br />tion are delivered on the job. Where concrete from a central mix- <br />ing plant (commonly termed "transit mixed ") is to be used, mate- <br />rials need not be on the job. <br />2. Frame Inspection: To be made after the roof, all framing, fire - <br />blocking, and bracing are in place and all pipes, chimneys and <br />all vents are complete. After rough electrical. <br />3. Lath and /or Wallboard Inspection. To be made after all lathing <br />and /or wallboard, interior and exterior, is in place; But before <br />any plastering is applied or before wallboard joints and fasteners <br />are taped and finished. <br />4. Final Inspection: To be made after building is completed and <br />ready for occupancy. Final electrical must be done. <br />Other Ins ections: In addition to the required inspections spec- <br />ified above, the Building Official may make or require any other <br />inspections of any construction work to ascertain compliance with <br />the provisions of this Code and other laws which are enforced by <br />the Building Department. <br />Make a drawing of your site. Indicate the dimensions of the front, <br />side and rear property lines. Specify which property line is front, <br />the name of the frontage road, and indicate which way is north. Also, <br />indicate all pre - existing structures, their use, size and location on <br />the site. Indicate location of proposed new construction. A complete <br />set of blue prints are required with application. <br />I hereby acknowledge that I have read this application and state that <br />information given is correct and agree not to start this project until <br />this application is approved and permit issued. I understand that I <br />must give a 24 hour notice on all required phases of construction. <br />Date of Application : F...pr. .Z/O.IIJ-3 <br />APPLICANT'S SIGNATURE ._1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.