My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-02_PERMIT FILE - M2013026 (10)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013026
>
2013-05-02_PERMIT FILE - M2013026 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:08 PM
Creation date
5/8/2013 11:11:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013026
IBM Index Class Name
Permit File
Doc Date
5/2/2013
Doc Name
New 110(2) Application, Part 1
From
Lockland, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURE or ITEM DESCRIPTION <br />Jld <br />-Shag Huddrp Supersfrudwe <br />DIMENSIONS <br />18"24"12 <br />18^24' <br />DEMOLITION MENU SELECTION <br />Demoldisp/excay. p1. lW haul <br />Demo /disp.exs.pl, 12- M. <br />QUANTITY <br />5,184.00 <br />432.00 <br />UNIT <br />CF <br />SF <br />UNIT COST <br />10.2132 <br />$3.4143 <br />TOTAL COST <br />$1,105.18 <br />$1,474.98 <br />Shaft ConCrWO Fbor <br />24"36"12' <br />24"38' <br />DemoJdlsp /excay. pf - 10K' haW <br />DemoJdisp. exs. pd, 12'th. -tOK R. <br />10,388.00 <br />864.00 <br />CF <br />SF <br />$0.2132 <br />$3.4143 <br />$2,21031 <br />52,949.9T <br />Hoisf Rmm d Slw <br />}Ip(� Room 6 Shop Concrete fkxx <br />CompressorRconl Supersfnxxuro <br />.Compressor Room- Conerels FbOf <br />32 "f0 ^12' <br />32 ^10 <br />Dem ./dlsplexc ,P4- 1OK'haW <br />Demoldbp. exs. px 12'M. -tOK11. <br />3,840.00 <br />320.00 <br />CF <br />SF <br />50.2132 <br />$34143 <br />$818.83 <br />$1,092.58 <br />10"10^10 <br />DemoJdLapJexeay. pd• tOK haW <br />1,000.00 <br />CF <br />50.2132 <br />5213.19 <br />-Water Tank Buddfn9 <br />12 118 112' <br />f2 ^18' <br />DemoldivJexcsv.pd- 10K'hsuf <br />Demoldisp. exs. pft, 12Th: fOK 8. <br />2,59200 <br />218.00 <br />CF <br />SF <br />$02132 <br />53.4143 <br />$552.58 <br />573748 <br />- HuMar HOW ROOF" <br />Fkxv <br />Hunter Concrete <br />Hunter ShaRHouse <br />- Hunter Shaft Concrete F)" <br />24"22'•15' <br />24"22' <br />9112 112' <br />Demo/disp/excay.P4- 10K'hato <br />DemoJdisp. exs. pf, 12'th. -tOK 11. <br />De=Jdisplexcov.p11 -lwhad <br />7,920.00 <br />528.00 <br />1,298.00 <br />CF <br />SF <br />CF <br />$0.2132 <br />$34143 <br />$0.2132 <br />$1,88843 <br />51,802.73 <br />$27829 <br />- Generafcw Shad <br />1,193 CY <br />Loa&haulydump rubble -to 1000011. <br />1,193.00 <br />CY <br />$1.5200 <br />$1,813.38 <br />-Dump Fees for pemdishad Structures <br />T.,tnl Cost <br />tadlusted <br />for locatlonl: <br />518,738 <br />JOB COST . 9uetom rymetwcaeg , • -,, •_ - - -- ... . <br />
The URL can be used to link to this page
Your browser does not support the video tag.