Laserfiche WebLink
EXHIBIT C <br />MINE PLAN <br />(Section 6.3.3) <br />Hopemore Shaft <br />Lake County, Colorado <br />Lockland LLC <br />A Lake County Conditional Use Permit (CUP) for the mine: *� <br />8, 2008. The CUP file no. 08 -28 is presented in Exhibit .f App <br />or processed at the mine site. (Section 6.3.3(1)m) Processing for <br />the Leadville Mill owned and operated by Union Milling TLC <br />Leadville, Lake County, Colorado. (Exhibit E, Figure E =.1) <br />,d-,-on or`'about November <br />No ore will be crushed <br />kP.Ytn ction will occur at <br />13815 Highway 24, <br />Mine Operation <br />.:\ 1•.. <br />f ground worngs relative to the Hopemore <br />All proposed mining will be from unde Shaft with a secondary <br />man way being provided by the Hunfe'r,shaft..�lvlining'and exploration will be conducted below an <br />elevation of 11,500 feet. Both vein type :a�idtedded replacement type ores will be mined. The mine is dry. <br />F..:�::':::•.:. <br />(Section 6.3.3(1)i). The depth to tlie;active'mme level is over 500 feet deep. Because of the depth in <br />excess 500 feet and limiter" Itie development; iio :surface subsidence is anticipated. A general layout of <br />the underground workings is prA�riied on Figure C - l. <br />Historically the l4-bpemore andhHunteroafts were associated with the historical IBEX mine complex.. <br />The general ore body to be mined;ranges from three to twenty feet thick and approximately 200 feet long. <br />(Section 6:3' <3(J)d. Production of:ore is scheduled to begin in 2013 and will continue through 203 <br />(Section 6.3.366. <br />Project Carnponent.p description and Earthmoving Requirements <br />No new surfaceYiine disturbance beyond the existing 1.9 acre disturbed area is proposed within the 9.9 <br />acre permit area (Section 6.3.3(f)). Mine rock will be mined at a rate of 40 to 80 tons a day. Ore will be <br />stored on a designated storage pad until the rocke Ore to be stored maximum amount of ore to be is estimated to be no <br />stored on site is estimated to be approximately 3 00 tonn <br />more than 60 days. One to four twenty ton trucks will move ore offsite per day for processing. No ore <br />January, 2013 <br />Lockland, LLC <br />Hopemore Shaft <br />Leadville, Colorado <br />