Laserfiche WebLink
Susan Burgmaier -5- May 2,2013 <br />6. DRMS: Please update Map 32, Topsoil Distribution Plan, to include the proposed <br />disturbance area associated with the gob pile expansion. <br />BOW -2: Please see revised Map 32. <br />Please feel free to call me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures: <br />Volume I: Pages 2.04 -101 & 102, 2.05 -50 <br />Volume II: Map 32 <br />Volume IX: Pages 4i, 7, 14 -19 Appendix A pages App. A -1, 2 <br />