My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-06_REVISION - C1981025
>
Day Forward
>
Revision
>
Coal
>
C1981025
>
2013-05-06_REVISION - C1981025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:15 PM
Creation date
5/8/2013 9:33:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
REVISION
Doc Date
5/6/2013
Doc Name
Response to Modification Drawings made
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
RN6
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7th STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />May 1, 2013 <br />Brock Bowles <br />Division of Reclamation Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Minrec Inc., North Thompson Creek Mines <br />Permit Renewal 6; Supplemental Information <br />Permit No. C- 1981 -025 <br />Dear Mr. Bowles: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />'eo,e\ Q <br />Vk <br />r b l0 <br />of ?,e ga eayor, <br />During a recent DRMS inspection it was noted that drawing D -2 -5 required a few updates. <br />On behalf of Minrec, Inc., the following modifications were made to the drawing. <br />1. The inlet to the long pond was changed to an open channel. The open channel was <br />designed to handle a 70 gpm flow. Flow calculations for the open are presented on <br />new page P -9 -11. A new section E -E was added to the drawing. <br />2. The 4" diameter emergency spillway for pond T -2 was shortened to match field <br />conditions. <br />3. A six inch diameter pipe was added to the outlet of pond T -2. This pipe conveys flow <br />from pond T -2 to the open channel that flows to Pond 9. <br />4. Some text under pipe notes was revised. <br />Enclosed are new design page P -9 -11 and drawing D -2 -5. <br />Sincerely, <br />r <br />J. E. Stover, P.E. <br />Consulting Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.