Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Drill pad BD4 (previously reclaimed) will be re- constructed (approx. 0.2 acres). This pad will <br />include up to three sumps to contain drill cuttings. Drill pad will a accessed by re-grading <br />feet of previously reclaimed temporary, low-standard road. Total of 2, approx. 2100' PQ-Size <br />holes w0th three 40'-800'wedcies per hole to be drilled using one drill r5q; each hole will be <br />abandoned in its entirety immediately upon completion. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 1.00 Average Width 100.00 (ft) Average Length 100-00 (ft) <br />B. Drill Holes: Quantity 2.00 Depth 9,000.00 (ft) Diameter 6.00 (i <br />C. Mud Pits: Quantity 3.00 Average Width 10-00 (ft) Average Length 10-00 (ft) <br />Average Depth 6.00 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None <br />F. Other Disturbances (please describe): <br />None <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No chemicals will be stored on site. An estimated 200 gallons of diesel fuel wil be <br />n tuei storage tanKS on <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length 470.00 (ft) Width 20.00 (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None <br />