Laserfiche WebLink
Page 2 of 2 <br />inspection to document the condition of the site. As all available monies for the site have been <br />expended, no additional funds are available for maintenance at the GEC mine. <br />This notification requires no specific action on your part. If you have questions, you may contact <br />me at the phone number listed below. The Division will also be conducting a final inspection <br />during the summer of 2013, at a time yet to be determined. Should you desire to attend this <br />inspection, please contact me for a specific date and time. <br />Sincerely, <br />(�r- <br />Janet H. Binns <br />Environmental Protection Specialist III <br />janet.binns @state.co.us <br />(3030) 866 -3567 ext. 8107 <br />C -SL -03 <br />