My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-30_REVISION - M2005003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005003
>
2013-04-30_REVISION - M2005003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:33 PM
Creation date
5/2/2013 1:34:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005003
IBM Index Class Name
REVISION
Doc Date
4/30/2013
Doc Name
TR Submittal
From
Van Valkenburg Cattle Co., LLC
To
DRMS
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7R 2 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- a C 05 — D0 3 Site Name: Jan 1/84 r e Pz <br />County rrae- k_5e, r TR# (DIM Use only) <br />Permittee: (/an V e'D-ist G Co • G• • <br />Operator (If Other than Permittee): / <br />Permittee Representative: LUG L(i a . ni 3'. V aw l /.lk Gnu (ou.i <br />Please provide a brief description of the proposed revision: , L 6. 4-f.- 'E-z4 -e (1..4-4 <br />1..4-4 —1-71° <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time. in writing, to provide the required information. <br />There is no pre- defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested FR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type <br />110c, 111, 112 construction <br />materials, and 112 quarries <br />112 hard rock (not DMO) <br />110d, 112d(1, 2 or 3) <br />Required TR Fee Submitted (mark only one) <br />$216,, <br />$175 <br />$1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.