Laserfiche WebLink
NOTES <br />MINING PROCEDURES ARE EXPLAINED IN EXHIBIT D. <br />PREVIOUS AMENDMENT TO THE PERMIT DELETED THE DECOMMISSIONING OF THE PLANT SITE <br />FROM THE FINANCIAL WARRANTY. <br />THIS TECHNICAL REVISION 4 DOES NOT CHANGE THE PERMIT BOUNDARY OR THE RECLAMATION <br />COSTS. <br />THE MINING PANELS ARE SIZED BY AN ASSUMED MINING AREA PER YEAR. THE NUMBER OF YEARS <br />IN EACH MINING PANEL MAY VARY BY THE DEMAND FOR PORTLAND CEMENT AND DEPTH OF THE <br />LIMESTONE. THE MINING PLAN IS PROJECTED FOR 50 YEARS, MORE OR LESS. <br />PANEL A Y1 Y5 86 ACRES <br />PANEL B Y6-Y15 170 ACRES <br />PANEL C Y16 -Y25 180 ACRES <br />PANEL D Y26 -Y35 205 ACRES <br />PANEL E Y36 -Y45 164 ACRES <br />PANEL F ¥46-Y50 78 ACRES <br />AS OF 2012, Y1 THROUGH Y3 OF MINING PANEL A ARE MINED AND UNDERGOING RECLAMATION. <br />THE CRUSHER, WHICH REDUCES ROCK TO 5" MINUS, IS RELOCATED IN 2013 TO ITS FINAL POSITION. <br />THE MAIN CORRIDOR INDICATES THE APPROXIMATE LOCATION OF THE MAIN STEM OF THE <br />CONVEYOR. SECONDARY CONVEYORS START AT THE END OF THE MAIN CONVEYOR AND REACH <br />TO THE MINING FACE. ALL CONVEYORS WILL RELOCATED, LENGTHENED, AND SHORTENED TO <br />FOLLOW THE MINING. <br />PHASE 1 OF 895 ACRES INCLUDES THE MINING AREA, PLANT SITE, FILL AREA, ACCESS ROAD, <br />ARROYOS, BORROW AREA, AND RR SPUR. <br />PHASE 2 OF 270 ACRES INCLUDES THE MINING AREA, ARROYO, AND STOCKPILE. <br />THIS TECHNICAL REVISION MAINTAINS THE ABOVE AREAS. <br />Property Boundary <br />LEGEND <br />Y00 <br />PROPERTY BOUNDARY <br />PERMIT BOUNDARY <br />RESOURCE AREA <br />MINING YEAR <br />MINING BOUNDARY <br />MAIN CONVEYOR CORRIDOR <br />1500 750 0 <br />1"=1500' <br />1500 3000 <br />t NM — <br />2 <br />0 <br />d <br />z <br />Sheet No. <br />a <br />O ° O <br />N o O LO <br />LJ <br />• Ce <br />• C" C <br />ZN <br />Q V X <br />Z uJ <br />I_ Ce <br />a 0 1-- <br />0 <br />J <br />w <br />a <br />Date <br />0423/2013 <br />Project No. <br />S <br />