Laserfiche WebLink
STOCK POND T -27 <br />PERMANENT POND DEMONSTRATION <br />In 2006, SCC has constructed a stock pond in the southern reclamation area at the II -W Mine and, <br />along with the land owner, believes that the pond should remain permanent. The location of this stock <br />pond T -27 is shown on Exhibit 20 -2, Postmining Topography Map. The purpose of this evaluation is <br />to demonstrate that Stock Pond T -27 meets the design criteria specified in Rule 4.05.9 for permanent <br />impoundments. <br />Water Quality <br />This stock pond is located in the upper portion of a watershed in the southern portion of the <br />reclamation area. There is no indication that either the spoil or the replaced topsoil contains potentially <br />acid or toxic forming material that could adversely impact surface water quality. Results of the 2012 <br />water sample analysis are attached. The analysis indicates that the water is suitable for the approved <br />post mine land use that includes livestock grazing and wildlife habitat. <br />Water Persistence <br />It is expected that this stock pond will contain water from the spring runoff through early summer at a <br />minimum. <br />Accessibility <br />This pond is easily accessible to livestock and wildlife. There are no drop offs or excessively steep <br />slopes around the edges of this pond. <br />CLapacily <br />The water storage capacity for T -27 is 1.27 ac. ft. Since the capacity is under the 2 ac. ft. limit, the <br />State Engineer's office does not need to review the permanency request and the pond should not have <br />any significant effect on downstream users. A general stability analysis was conducted for stock ponds <br />based on the construction methods and material characteristics. A predicted Factor of Safety of 1.56 <br />was calculated by this analysis. This stability analysis is contained in Attachment 13 -11 and a <br />summary copy is attached. <br />Pond Dimensions <br />The dimensions and capacity for this stock pond are shown on Exhibit 13- 27.T27, Stock Pond T -27 <br />Survey. As shown on the as-built drawing, the embankment is 9.2 feet in height as measured from the <br />pond bottom to the invert of the spillway; however the pond was excavated to provide fill for the <br />embankment. Therefore the embankment is less than 5 feet in height from the upstream natural toe of <br />the embankment to the invert of the spillway. The combined slope of all the embankments do not <br />exceed 5V: I H with no slopes greater than 2H:1 V. <br />