My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-08_PERMIT FILE - C1982057A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2013-04-08_PERMIT FILE - C1982057A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:15 PM
Creation date
5/1/2013 1:50:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
4/8/2013
Doc Name
Permanent Pond Demonstrations
Section_Exhibit Name
Tab 20 Attachment 20-2 Appendix 20-2.2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STOCK POND T -5 <br />PERMANENT POND DEMONSTRATION <br />In 2004, SCC has constructed a stock pond in the middle portion of a permanent channel in the A Pit <br />reclamation and, along with the land owner, believes that the pond should remain permanent. The <br />location of this stock pond T -5 is shown on Exhibit 20 -2, Postmining Topography Map. The purpose <br />of this evaluation is to demonstrate that Stock Pond T -5 meets the design criteria specified in Rule <br />4.05.9 for permanent impoundments. <br />Water Quality <br />This stock pond is located on a permanent channel. There is no indication that the runoff contains <br />potentially acid or toxic forming material that could adversely impact surface water quality. Results of <br />the 2012 water sample analysis are attached. The analysis indicates that the water is suitable for the <br />approved post mine land use that includes livestock grazing and wildlife habitat. <br />Water Persistence <br />Observations indicate that this pond holds water year - round. <br />Accessibility <br />This pond is easily accessible to livestock and wildlife. There are no drop offs or excessively steep <br />slopes around the edges of this pond. <br />Cgpacily <br />The water storage capacity for T -5 is 0.6 ac. ft. Since the capacity is under the 2 ac. ft. limit, the State <br />Engineer's office does not need to review the permanency request and the pond should not have any <br />significant effect on downstream users. A general stability analysis was conducted for stock ponds <br />based on the construction methods and material characteristics. A predicted Factor of Safety of 1.56 <br />was calculated by this analysis. This stability analysis is contained in Attachment 13 -11 and a <br />summary copy is attached. <br />Pond Dimensions <br />The dimensions and capacity for this stock pond are shown in the PAP on Exhibit 13- 27.T5, Stock <br />Pond T -5 Survey. As shown on the as-built drawing, the embankment is 4 feet in height as measured <br />from the pond bottom to the invert of the spillway; however the pond was excavated to provide fill for <br />the embankment. Therefore the embankment is less than 5 feet in height from the upstream natural toe <br />of the embankment to the invert of the spillway. The combined slope of all the embankments do not <br />exceed 5V:1H with no slopes greater than 2H:1V. <br />
The URL can be used to link to this page
Your browser does not support the video tag.