Laserfiche WebLink
1 X <br />Last Chance Pond Volume <br />Gallons Acre feel <br />�{- Primary Spillway 76,600 0.235 + <br />Emergency Spillway 108,200 0.332 / <br />J <br />I <br />DISCHARGE <br />TO WASH <br />s <br />+- <br />ti. <br />r b <br />SH -34 m� <br />i <br />a <br />X <br />Pond volumes at point of dis.;hargF. <br />Pond Vol gallons Vol acre feel ! <br />1 56,300 0.173 -�- <br />2 65,700 0.202 <br />X 3 52,200 0.160 <br />a 64,200 0.197 <br />5 243,000 0.746 <br />i 6 316,400 0.971 �( <br />X Scale: 1" = 100' <br />Dewatering Pond Typical Cross Sections <br />-2 <br />4 <br />�.,�aL <br />/sNUwRY <br />�paICINRL GRWNO <br />TOPSOIL <br />o -Too <br />G +s n +lo <br />o +ls <br />0+20 <br />u +21 aao <br />0-e3e a. 40 <br />SECTION D - D' <br />SUaSOIL <br />+2 <br />SPILLWAY <br />\aLVAININ __ <br />/OPoGINPL GROUND <br />SUBSgL <br />D <br />2 <br />4 <br />G <br />0 +00 <br />0 +20 11 +40 <br />0 +60 <br />U +NO <br />0 +100 0+120 <br />0 +140 0 +160 <br />SECTION E - E' <br />Drawing I'll l N: \PERP <br />i <br />EMERGENCY <br />SPILLWAY <br />Water from the B -seam will be pumped through Service Hole SH -3 to the surface. This water is expected <br />to carry excessive suspended solids which will be treated by the settling ponds shown on this drawing. <br />Following settling and passing through the artificial wetlands this water will be discharged via an approved <br />NPDES discharge point. <br />Designs shown are the initial construction. Slight modifications may occur during operation to better <br />improve efficiency of the structures while preserving the intent and general character of the designs. <br />Hydrologic modeling only used Ponds 3, 4, and the 'Last Chance' pond. The first two ponds are <br />considered operational for handling sediment. Ponds 5 and 6 were added to incorporate addition safety <br />factor allowing more time to respond to unforeseen treatment needs. <br />Artificial wetland are expected to evolve over time. Current construction is shown with additions/ <br />modifications expected within the wetland footprint shown. The intent is to create shallow wetlands over <br />approximately 50% of the area. The actual extent will be dictated, in part, by the rate water is pumped <br />from underground. Water will be distributed through a series of berms and trenches. <br />Best management practices will be used to control erosion prior to vegetation establishment. <br />The area is surrounded by an exclosure fence designed to keep livestock out. This is necessary to <br />prevent damage to the wetlands and diversion structures associated with this facility. <br />See Illustration 55 for detailed hydrologic modeling. This modeling includes only portions of the total <br />system. Therefore, the model is highly conservative as much more retention time and storage is in place. <br />I have inspected the impoundments described herein <br />and certify that they have been constructed to the C <br />intent oft nd in accordance with the <br />approv Utt°F abI Pgulations. <br />.O . «.. <br />(qJ0 <br />43992 <br />Last Chance Pond <br />Scale: 1" = 20' <br />Contour interval: 1 foot <br />H' <br />1 <br />2 <br />3 <br />4 <br />i/ <br />C' <br />SPILLWAY <br />As -built to add more detail <br />tewatering Ponds 5 $ 6 <br />indudina Ponds 5 and 6 <br />Re,Aaion <br />I -FD <br />'H' FLOP <br />A' Scale: 1" = 10' <br />C' <br />y1.D <br />2.0' f III <br />IF <br />1' MIN �4' 2' aso RIP RAP L5 AT HIGHEST IA I \4' 1 -3• RIP RV <br />IN EMBANKMENT <br />SECTION A -A' <br />a -12• THICK 12- <br />d50 RIP RAP SECTION B-B' <br />Q`P'O\�ye`C� <br />4r <br />5608 /FINISHED POND EMBANKMENT <br />,,ORIGINAL GROUND �— <br />5606 <br />SPILLWAY FLOW�NE� 1' —�IXI ING GROUND <br />5604 <br />'�RNISHED POND IXCAVATON RUME <br />5602 <br />5800 CHANNEL ROW LINE <br />5598 <br />0 +00 0 +10 0 +20 0430 0 +00 0 +50 0 +60 <br />SECTION C -C' <br />5608.00 <br />5607.75 <br />560750 <br />5607.25 <br />5607.D0 <br />5606.75 <br />0+00 <br />212012 <br />Date Clr <br />/ORIGINAL GROUND <br />0 +10 <br />0 +20 <br />FlNISHED POND EMBANKMENT \ \ \\ <br />EMERGENCY SPUWAY <br />FLOW UN \ <br />0 1 M 0+40 0 +50 01 -60 <br />SECTION D -D' ^7 — i O ` 13 <br />C �q 1 � f�►� i�ZIZ -155 - � 65 <br />BLUE MOUNTAIN ENERGY, INC. <br />DESERADO MINE RANGELY, COLORADO <br />Map 157 B -Seam Dewatering <br />g. by: Dwg. Me Name: <br />scw <br />L by: Appr. by <br />de: as noted Date. 4/17/2012 Rev. 4 <br />