Laserfiche WebLink
RULE 2 - PERMITS <br />2.01 General Permit Requirements <br />2.01.1 Scope <br />The scope of this sectloll establishes the minimum general requirements for permits required to <br />commence or Continue UndergroUlld coal Illllling and reclamation operations under the Colorado <br />regulatory framework. The objective of this section is to assure that all operations make timely <br />application for permits, and that all Underground coal mining and reclamation operations are <br />conducted only under permits issued in accordance with the requirements of tine Colorado Surface <br />Coal Miniilo Reclamation Act and regulations promulgated there Linder. <br />2.01.2 General Requirements for Existing Operations <br />Peabody Sage Creek Mine (PSCM) is not an existing operation. so this section is not applicable. <br />2.01.3 General Requirements for Permits for All Surface Coal Mining and <br />Reclamation Operations <br />Peabody Sage Creek Mining. LLC (PSCM) has prepared this application in compliance with the <br />applicable requirements of Rules 2, 3, and 4 of the approved Regulations for the Colorado Mined <br />Land Reclamation Board (CMLRB) for Coal Mining. <br />2.01.4 Permit Requirements for New Surface Coal Mining and Reclamation <br />Operations <br />A complete permit application is beinil filed in accordance with applicable provisions of Rules 2 <br />and 4. <br />2.01.5 Permit Term <br />With this Permit Application submittal, PSCM is submitting the information necessary for the <br />Colorado Division of Reclamation, Mining. and Safety (CDRMS) to make a finding that PSCM will <br />conduct underground mining operations for the initial permit term of five years in compliance with <br />all applicable regulatory provisions. PSCM has a reasonable expectation that the proposed <br />activities will be initiated within three years of permit approval, and project initiation will not <br />extend beyond the period for diligent development allowed on any Federal coal lease under Section <br />7 of the Federal Mineral Lands Leasing Act, as amended. At this time PSCM does not anticipate <br />the need for extension of the time allowed for commencement of operations, but wishes to reserve <br />the right to request an extension, if needed in the future, under the applicable regulatory provisions <br />of Rule 2.01.5. If initial operations prove technically and economically viable, PSCM anticipates <br />that filings will be made for renewal of the mine permit for additional five -year permit terms under <br />applicable regulatory provisions providing for the right of renewal for successive renewal. <br />2.01.6 Permit Fees <br />PSCM will pay the permit fee of $2,500 dollars with this permit application. PSCM's permit area is <br />approximately 10,164 acres. <br />Midterm Review 2.01 -1 Revision 04/2013 <br />