Laserfiche WebLink
Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />1.00 <br />ACRE <br />$153.53 <br />$153.53 <br />Total Mulch Materials Cost/Acre <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />_ _ <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Hydromulch, 1 ton/ac. rate {Materials Only} <br />1.00 <br />ACRE <br />$153.53 <br />$153.53 <br />Total Mulch Materials Cost/Acre <br />$261.28 <br />$153.53 <br />Description <br />Cost /Acre <br />Cost /Acre <br />Broadcast seeding [DMG1 <br />$13.76 <br />$261.28 <br />$13.76 <br />• <br />Total Seed Application Cost/Acre <br />$261.28 <br />Description <br />Cost /Acre <br />Hay bales, staked, >3h:ly (MEANS 3125 14.16 1310) <br />$13.76 <br />Total Mulch Application Cost/Acre <br />$13.76 <br />Reveg Worksheet Cont'd <br />Totals Seed Mix <br />58.00 <br />MULCHING and MISCELLANEOUS <br />NURSERY STOCK PLANTING <br />JOB TIME AND COST <br />No. of Acres: 50 Cost /Acre: $1,048.70 <br />Estimated Failure Rate: 10% Cost /Acre *: $1,048.70 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />Initial Job Cost: $52,435.00 <br />Reseeding Job Cost: $5,243.50 <br />Total Job Cost: $57,678.50 <br />Job Hours: 0.00 <br />Task # 003 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />