Introduction <br />EXHIBIT D <br />RIO GRANDE SILVER, INC <br />BULLDOG MOUNTAIN OPERATION <br />REVISED MINING PLAN <br />Rio Grande Silver (RGS) is proposing to add four additional "Affected Areas" G -J to <br />Permit No. M- 1977 -215. This permit lies in SW %, Section 25, T42N, R1 W, NMPM, of <br />Mineral County, Colorado. These additional "Affected Areas" will provide more acreage <br />for the Bulldog Mountain Operation. This additional acreage will be for future proposed <br />pipelines, structures and additional waste rock storage. <br />"Affected Areas" G and H are for the construction of a discharge pipeline from Bulldog <br />Mountain Operation to West Willow Creek. This pipeline will transport treated water <br />from a proposed water treatment plant. This water treatment plant will treat all water <br />that is pumped from the 9400 Decline Operation. We have added two "Affected Areas" <br />G and H for two different alignments. The preferred alignment is along the original <br />Homestake Mining pipeline. This pipeline was utilized during the historic mining to bring <br />fresh water up to the Bulldog Operation. This alignment is in the "Affected Area" H. If <br />conditions exist that we are not able to utilize the old pipe line alignment then we have <br />added "Affected Area" G. This alignment would go through Windy Gulch. This <br />alignment is not preferred due to the potential disturbance to the already reclaimed <br />Windy Gulch. This reclamation has been completed by the Willow Creek Reclamation <br />Committee. <br />"Affected Area" I is for the addition of mine support facilities and utilities to these and the <br />existing Bulldog Administration Building. <br />"Affected Area" J is for additional waste rock storage adjacent to the existing tailings <br />dam facility. <br />"Affected Area" D is being reduced in size to minimize the impact on adjacent <br />properties. The area was already included in our permit. The intended use for that area <br />is to provide room for pipelines and associated structures as well as additional waste <br />rock storage. <br />There are currently no changes being proposed in the existing mining plan by <br />this amendment. This is strictly for the purpose of securing the land package for <br />potential additional development. <br />