Laserfiche WebLink
Herewith we have enclosed two copies of all of the documents, maps, and tables <br />with reference indexes that correspond to the permit outline. As was previously <br />discussed, we will be addressing the Water Treatment works, Mill, and other <br />planned additions as Technical Revisions to the permit as the designs are <br />finalized. <br />We appreciate your assistance in processing this Amendment, and look forward to <br />working with you towards the successful completion of this project. <br />Please do not hesitate to call or email if you should have questions or need more <br />data. <br />Thank you, <br />0,u ,t <br />Randy McClure <br />General Manager <br />Rio Grande Silver, Inc. <br />rmcclure@hecla- mining com <br />970 -317 -5355 <br />625 USFS Road 504.1A P.O. Box 610 Creede, CO 81130 <br />719 - 658 -1080 Fax 719- 658 -1082 <br />