My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2013-04-10_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:19 PM
Creation date
4/29/2013 8:21:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
4/10/2013
Section_Exhibit Name
Section V. Mine Surface Facilities Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• It was also assumed that since the drainage basins are small, no sediment would be deposited until <br />it reaches the sediment control ponds. <br />The three -year sediment yield is calculated as follows: <br />Sediment Volume = (AxAr)Tons/Vr x 2,000 lb/Ton x 3 yr <br />(Acre -feet) 80 lb/cu ft x 43560 sq ft/acre <br />Sediment volume calculations for sediment ponds are included in Illustrations 4, 5, 6, 6A and 7. <br />The sediment volume requirements are also shown on the pond drawings, Maps 34, 78, 79, 80 and <br />80A. <br />Peak runoff flow rates were initially estimated using procedures set forth in SCS -TP -149 (Rev. <br />1973) "A Method of Estimating Volume and Rate of Runoff from Small Watersheds." In all cases, <br />runoff curve numbers (RCN) were selected assuming antecedent moisture condition two (AMC II) <br />prevailed. Disturbed areas were assumed to be the same as "farmstead" areas in Table 2 <br />(NRCS -TP -149). Undisturbed areas were assumed to be the equivalent of "fair range without <br />mechanical treatment', in Table 2 (NRCS -TP -149). Hydrologic soil groups were taken from the <br />NRCS soil survey data previously discussed. <br />• Total runoff volumes for 10 -year, 24 -hour storms were determined from Figure 3 of NRCS -TP -149 <br />which is a solution of the runoff equation: <br />Q = P -0.2xS z <br />(P +0.8xS) <br />where: <br />Q = accumulated direct runoff <br />P = accumulated rainfall (from design storm) <br />S = potential maximum retention <br />1000-10 <br />RCN <br />RCN = runoff curve number <br />Runoff calculations for ponds designed before mine construction are included in Illustrations 4, 5, 6, <br />and 7. <br />The available pond capacities were determined by the average end area method from planimetered <br />areas of contours shown on the drawings. All ponds were sized according to the requirements of <br />Section 4.05.6. <br />The peak runoff rates to the ponds for the 25 -year, 24 -hour and 100 -year, 24 -hour storms were <br />• initially determined for preliminary design purposes from the graphical procedures for determining <br />Mid -Term Review 2002 (812002) V -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.