My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-25_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2013-04-25_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:50 PM
Creation date
4/26/2013 9:36:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
4/25/2013
Doc Name
1st Quarter 2013 Horse Gulch Fill Quarterly Inspection Report Letter
From
DRMS
To
Trapper Mining, Inc
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />C O L O RA D O <br />D I V I S I O N o f <br />Denver, Colorado 80203 <br />RECLAMATION <br />Phone: (303) 866 -3567 <br />M IN I NIN G <br />N <br />FAX: (303) 832 -8106 <br />SAFETY <br />April 25, 2013 <br />John W. Hickenlooper <br />Governor <br />Tonia M. Perkins, P.E. <br />Trapper Mining, Inc <br />Mike King <br />P.O. Box 187 <br />Executive Director <br />Craig, CO 81626 <br />Loretta Pineda <br />Director <br />RE: Trapper Mining, Inc., Permit C- 1981 -010 <br />1st Quarter 2013 - Horse Gulch Fill Quarterly Inspection Report <br />Dear Ms. Perkins: <br />The Colorado Division of Reclamation, Mining, and Safety ( CDRMS) has reviewed and found the above <br />referenced report to be in general compliance with the following CDRMS regulations: <br />4.09. 1 (11) (a) Inspected at least quarterly by a reregistered engineer or other qualified professional specialist <br />in construction of earth and rockfill embankments under the direction of a qualified engineer <br />throughout the construction. <br />The certified report covers the first quarter monitoring period from January to March 2013, and <br />the inspections were conducted by yourself, a certified engineer. <br />4.09. 1 (11) (b) Provide to the Division a certified report within 2 weeks after each inspection that the fill has <br />been constructed as specified in the design approved by the Division. The report shall include a <br />description of any appearances of instability, structural weakness, and other hazardous <br />conditions. <br />The inspection was conducted on March 28, 2013. The Division received the report on April 4, <br />2013. No instability, structural weakness, or other hazardous conditions were noted during this <br />inspection of the fill. However, it was noted in the report the some cracking from differential <br />settling was noticed on the top south portion of the fill and that these cracks would be filled and <br />monitored on a regular basis. Also, two spots above the 7350' elevation on the south side of the <br />fill showed some differential settling. These areas will also need to be monitored. <br />If you have any questions feel free to contact me. (303) 866 -3567, extension 8120. <br />Sincerely, <br />Jared Ebert <br />Environmental Protection Specialist <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.