Laserfiche WebLink
Permittee Contact: <br />James A. Davis <br />Permittee Company: <br />LaPlata County <br />Address: <br />1060 Second Avenue <br />Durango, CO 81301 <br />Phone Number: <br />(970) 382 -6363 <br />Fax Number: <br />(970) 375 -7986 <br />Email Address: <br />CF.PR.email <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatme on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO ", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />19. Is your basis for legal right to enter still valid? <br />20. Does your permit require you to submit monitoring information annually? <br />If "Yes ", please attach the required monitoring results to this Annual Report. <br />( e r i / /o <br />Signature of Permittee, CQrpo ate Officer, Owner, or Documented Designee F ate <br />Page 3 of 3 <br />YC NO N/A <br />NO N/A <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/AT <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO 613 <br />YES NO <br />ES NO <br />YES TO ) N/A <br />21. As required by rule, attach a map to this report that accurately depicts the permit boundary, current affected area <br />boundary and location of the acreages specified in items 7- 12 and 14. UPDATED MAP ATTACHED: [/ <br />Division records indicate the following permittee contact information. If this information is not current, please type or <br />print current contact information: <br />I, the undersigned, hereby state that the i ation provided in this report is true and accurate, and that site operations are <br />being conducted in accordancey4 the pproved mining and reclamation plans. <br />