Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 004 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: HAXTON <br />Total one -way travel distance: 5.00 miles <br />Average Travel Speed: 40.00 mph <br />Transportation Cycle Time: <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Non - Roadable <br />Equipment Roadable <br />E. ui. ment <br />Haul Time (Hours): 0.13 0.13 <br />Return Time (Hours): 0.13 0.13 <br />Loading Time (Hours): 0.00 NA <br />Unloading Time (Hours): 0.00 NA <br />Subtotals: 0.25 0.25 <br />JOB TIME AND COST <br />Total job time: <br />$1,135.09 <br />$0.00 <br />Total job cost: $1,135.09 <br />0.50 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />