Laserfiche WebLink
Three French drains will be installed at the current ground surface once backfilling <br />reaches that elevation. These will intercept surface water recharge and direct the flow <br />into the stormwater drainage system. The drains will have a minimum ten -foot bottom <br />width, 2:1 sidesiopes and be at least 20 feet deep. <br />Transit Mix Aggregates Company/ Castle Concrete/ Continental Materials Corporation <br />Corporation <br />Pikeview Quarry <br />CORMS Landowner Notification <br />Please do not hesitate to contact Mac Shafer or Jeremy Pritchett if you have any <br />questions. <br />Sincerely, <br />Mac Shafer <br />Vice President of Aggregates <br />Transit Mix/Castle Concrete /Continental Materials <br />Attachments <br />Figure 1 — Plot Plan <br />Certified Mail No. 700 / •/ 06 <br />tt S7 13 7L) <br />