My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-19_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-04-19_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:41 PM
Creation date
4/25/2013 4:52:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
4/19/2013
Doc Name
110(d) PERMIT APPLICATION
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIGURE 7 - TYPICAL BENTOMAP INSTALLATION TECHNIQUE <br />FIGURE 8 - UNROLLING BENTOMAT <br />5.5 <br />Care must be taken to minimize the extent to which the GCL is <br />dragged across the subgrade to avoid damage to the bottom <br />surface of the GCL. Care must also be taken when adjusting <br />BENTOMAT CLT panels to avoid damage to the geotextile surface <br />of one panel of GCL by the textured sheet of another panel of <br />GCL. A temporary geosynthetic subgrade cover commonly <br />known as a slip sheet or rub sheet may be used to reduce friction <br />damage during placement. <br />5.6 <br />The GCL should be placed so that seams are parallel to the <br />direction of the slope. End -of -panel seams should also be located <br />at least 3 ft (1 m) from the toe and crest of slopes steeper than <br />4H:1V. End -of -roll seams on slopes should be used only if the <br />liner is not expected to be in tension. <br />5.7 <br />All GCL panels should lie flat, with no wrinkles or folds, especially <br />at the exposed edges of the panels. When BENTOMAT <br />geosynthetic clay liners with SUPERGROOVE® is repositioned, it <br />should be gripped inside the SUPERGROOVE by folding the edge. <br />5.8 <br />The GCL should not be installed in standing water or during <br />rainy weather. Only as much GCL shall be deployed as can be <br />covered at the end of the working day with soil, geomembrane, <br />or a temporary waterproof tarpaulin. The GCL shall not be left <br />uncovered overnight. If the GCL is hydrated when no confining <br />stress is present, it may be necessary to remove and replace <br />the hydrated material. CETCO recommends that premature <br />hydration be evaluated on a case -by -case basis. The project <br />engineer, CQA inspector, and CETCO TR -312 should be consulted <br />for specific guidance if premature hydration occurs. The type <br />of GCL, duration of exposure, degree of hydration, location <br />in the liner system, and expected bearing loads should all be <br />considered. <br />coe <br />www.CETCO.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.