Laserfiche WebLink
INSTALLATION GUIDELINES <br />BENTOMAT <br />GEOSYNTHETIC CLAY LINERS <br />FIGURE 1 -SPREADER BAR ASSEMBLY <br />2.5 <br />When installing over certain geosynthetic materials, a 4 wheel, <br />all- terrain vehicle (ATV) can be used to deploy the GCL. An ATV <br />can be driven directly on the GCL provided that no sudden stops, <br />starts, or turns are made. <br />2.6 <br />Additional equipment needed for installation of CETCO GCLs <br />includes: <br />► Utility knife and spare blades (for cutting the GCL) <br />► Granular bentonite for end -of -roll GCL seams and for <br />sealing around structures and details <br />• Waterproof tarpaulins (for temporary cover on installed <br />material as well as for stockpiled rolls) <br />• Optional flat - bladed vise grips (for positioning the GCL <br />panel by hand) <br />2.7 <br />The CETCO EASY ROLLERTM GCL Deployment System is a <br />preferred method of installing geosynthetic clay liners. Use of <br />the EASY ROLLER system eliminates the need for spreader bars <br />and heavy core pipes. Installation speed and worker safety are <br />also significantly increased. For further details, contact CETCO. <br />2870 Forbs Avenue Hoffman Estates, IL 60192 <br />847.851.1800 1 800.52 7.9948 <br />- 4 - <br />FIGURE 2 - HOOK MOUNT <br />FIGURE 3 - FORK MOUNT (WITH FORK POCKETS) <br />FIGURE 4 - PIN MOUNT <br />