Laserfiche WebLink
INSTALLATION GUIDELINES <br />BENTOMAT <br />GEOSYNTHETIC CLAY LINERS <br />1. Introduction <br />2. Equipment Requirements <br />3. Shipping, Unloading, and Storage <br />4. Subgrade Preparation <br />5. Installation <br />6. Anchorage <br />7. Seaming <br />8. Sealing Around Penetrations and Structures <br />9. Damage Repair <br />10. Cover Placement <br />11. Hydration <br />NOTICE: THIS DOCUMENT IS INTENDED FOR USE AS A GENERAL GUIDELINE FOR THE INSTALLATION OF CETCO GCLS. <br />THE INFORMATION AND DATA CONTAINED HEREIN ARE BELIEVED TO BE ACCURATE AND RELIABLE. CETCO MAKES NO <br />WARRANTY OF ANY KIND AND ACCEPTS NO RESPONSIBILITY FOR THE RESULTS OBTAINED THROUGH APPLICATION <br />OF THIS INFORMATION. INSTALLATION GUIDELINES ARE SUBJECT TO PERIODIC CHANGES. PLEASE CONSULT OUR <br />WEBSITE @ WWW.CETCO.COM /LT FOR THE MOST RECENT VERSION. <br />2870 Forbs Avenue Hoffman Estates, IL 60192 <br />847.851.1800 1 800.527.9948 <br />-2- <br />CONTENTS <br />Page 3 <br />Page 3 <br />Page 5 <br />Page 5 <br />Page 6 <br />Page 8 <br />Page 8 <br />Page 9 <br />Page 10 <br />Page 12 <br />Page 12 <br />