The Leadville Mill <br />4.3.3 TSF STABILITY & TSF DESIGN <br />M 1990 -057 <br />EXHIBIT C — MILL PLAN <br />Page 4 -12 <br />• Install TexDrain® TD 300 leak detection drainage net system, or equivalent, <br />between the top of the geosynthetic clay liner and the bottom of the 45mi1 <br />reinforced polypropylene capable of intercepting liquid within the leak <br />detection zone and conveying the liquid to a collection sump for storage. <br />• Install leak collection sump and piping in pond corner and connect leak <br />detection drainage net system to the sump. <br />• Lining contractor to install geosynthetic clay liner, leak detection drainage net <br />system and 45mi1 reinforced polypropylene. <br />• Liner materials will be tested at intervals specified by manufacturer and <br />contractor but not less than two tests will be performed. <br />• Materials or construction not meeting standards and design specifications will <br />be removed and repaired. <br />The existing tailings facility will be removed and the new TSF embankment will be <br />reconstructed as shown in Figure 4 -6. The compacted fill embankment has a 2.5:1 <br />(horizontal to vertical) outside face, and a 2:1 interior face. Fill material will have top <br />size of 6in and contain approximately 50% silt and clay. Fill will be placed in 10 -12in <br />level lifts and compacted by a self - propelled sheep foot roller. Fill will be placed and <br />compacted to 95% of Standard Proctor dry density (ASTM D 698). Fill will be scarified <br />between lifts. Fill will be moisture conditioned to within 2% of optimum. <br />Construction engineer will be on site to provide testing during fill placement and <br />verify compaction of floor of pond by number of tests recommended by CTL <br />Thompson. CTL Thompson, Inc. has conducted slope stability analysis on the TSF <br />embankment as shown in Figure 4 -6 and 4 -7. Samples were collected from drilling <br />two (2) additional holes to verify and confirm the 1990 permeability testhole data <br />and additionally confirm the embankment materials and underlying soils. <br />Additionally, a sample of tailings materials generated from laboratory .testing was <br />analyzed. The embankment materials, native soils and tailings materials were tested <br />for strength and classification, using direct shear tests for use in analyzing slope <br />stability of the embankment. The results are presented in the July 8, 2011 Report <br />(see Appendix 15 -5). Subsequently, CTL Thompson issued an update to the July 8, <br />2011 Report (see Appendix 15 -6). <br />Version 1.0 April 2013 <br />