My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-19_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-04-19_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:41 PM
Creation date
4/25/2013 4:52:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
4/19/2013
Doc Name
110(d) PERMIT APPLICATION
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tailings Storage Volume <br />Capacity <br />Total Volume (yd3) <br />43,000 <br />Freeboard Volume (yd3) <br />6,790 <br />Net Volume (yd3) <br />36,210 <br />Net Volume (ft3) <br />977,670 <br />Net Weight (st) <br />54,315 <br />Production Rate (st/y) <br />56,000 <br />Concentrate (11% mass pull) <br />6,160 <br />Concentrate Shipped (wet st) <br />6,840 <br />Tailings (89 %) (st) <br />49,840 <br />Solids ( %) <br />65% <br />Water ( %) <br />35% <br />Water Reclaim ( %) <br />90% <br />Net Tailings Slurry (st) <br />52,524 <br />Capacity (years) <br />1.03 <br />Description <br />Volumes <br />Cut (yd) <br />18,000 <br />Fill (yd <br />23,000 <br />Net Excess (yd <br />(5,000) <br />The Leadville Mill <br />The TSF, as a 110(2) permit, was developed within the existing 4.6 acre TSF area. The <br />TSF 4.6ac area is shown on Figure 4 -5 with the TSF located within the black line <br />polygon area south of the mill. The TSF is shown on Figure 4 -6 and the TSF cross - <br />section is shown on Figure 4 -7. The leak detection system and sump design is shown <br />on Figure 4 -8. <br />The facility is a cut and fill structure, requiring about 4,500yd of fill from the existing <br />TSF OB stockpile east of the existing pond. The 4,500yd represents the excess <br />cut material stockpiled from the original TSF construction. This material has been <br />incorporated into the cut and fill balance for the new TSF construction. Table 4 -8 <br />presents the cut and fill balance for the structure. The net operating capacity is <br />54,000st. The total pond capacity is 22.4ac -ft. Additional expansion requires <br />increasing the disturbance area beyond the 10ac 110 permit maximum disturbance <br />and the conversion from a 110(2) permit to a 112 permit. <br />TABLE 4 -8: TSF IMPOUNDMENT VOLUMES <br />TABLE 4 -9: TSF CAPACITY <br />M1990 -057 <br />EXHIBIT C — MILL PLAN <br />Page 4 -10 <br />Version 1.0 April 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.