Laserfiche WebLink
The Leadville Mill <br />• Truck scales; <br />• Multiple RoM concrete storage bunkers; <br />• An enclosed crushing and screening building; and <br />• A conveyor system connecting to the Mill Building. <br />4.2 MILL MANAGEMENT ACTIVITIES (SEC 6.3.3(M)) <br />4.2.1 MATERIAL HANDLING <br />M1990-057 <br />EXHIBIT C — MILL PLAN <br />Page 4 -3 <br />A new crushing facility, which will allow for selective ore handling and storage, is <br />scheduled for construction in the next expansion phase. The crushing facility will <br />include; <br />Ore will be dumped directly from haul trucks into a 35t capacity coarse ore bin prior <br />to feeding the crusher circuit (Figure 4 -3). Upstream of the crusher is a vibratory <br />screen designed to screen out 3/8" minus material bypassing the crushing circuit. <br />The crushing circuit is composed of a 9 "x15" jaw crusher, which discharges directly <br />into a roll crusher (16 "x10" face). Ore will report to the vibratory screen where <br />oversize material will report to the primary and secondary crushers before being <br />conveyed to the fine ore bin. Undersized material will by -pass the crushing circuit <br />and will be conveyed directly to the fine ore bin. <br />The jaw crusher will be set to a closed side setting of approximately 0.5 ". The <br />product from the jaw crusher will report directly to the secondary roll crusher. <br />Product from the roll crusher will join the screen undersize to be conveyed to the fine <br />ore bin (Figure 4 -2). The fine ore bin has a maximum capacity of 100t. <br />The Mill uses conventional technology via a combination of crushing, grinding, <br />classification, flotation and gravity concentration and filtration. Design of the mill is <br />such that either oxide or sulfide ores may be concentrated. The RoM ore delivered <br />by trucks, weighed, and stored in a 35t capacity coarse ore bin, (Figure 4 -3) will be <br />crushed in a two -stage operation to a final size of about -3/8 ". A conveyor will move <br />the ore to the 100t fine ore bin located in the mill building. <br />In the future, a new crushing /screening and storage receiving facility will be <br />constructed which will allow RoM ore to be dumped directly from the trucks into <br />bunkers prior to feeding the crusher circuit. RoM material from either the storage <br />bunkers or directly from trucks will be fed through a grizzly into the coarse ore bin <br />Version 1.0 Apri12013 <br />