Laserfiche WebLink
The Leadville Mill <br />M 1990 -057 <br />TABLE OF CONTENTS <br />14.18.1 (A) MITIGATION MEASURES 14 -19 <br />14.18.2 (B) MEASURES TO PREVENT WILDLIFE CONTACTING DESIGNATED <br />CHEMICALS 14 -19 <br />14.19 DISPOSAL OF TAILINGS IN MINE WORKINGS (SEC 6.4.21(19)) 14 -19 <br />15.0 GEOTECHNICAL STABILITY (SEC 6.5) 15 -1 <br />16.0 EMERGENCY RESPONSE & MANAGEMENT PLAN (RULE 8) 16 -1 <br />16.1 INFORMATION CONTACTS & VERIFICATION OF PLAN 16 -1 <br />16.1.1 ALTERNATIVE CONTACT 16 -2 <br />16.2 GENERAL DESCRIPTION 16 -2 <br />16.3 EMERGENCY CONTACT INDEX 16 -3 <br />16.4 EMERGENCY MANAGEMENT PROCEDURES 16 -3 <br />16.5 ON -SITE EMERGENCY RESPONSE EQUIPMENT 16 -7 <br />16.6 MILL EMERGENCY NOTIFICATION PLAN 16 -7 <br />16.6.1 COMMAND CENTER 16 -7 <br />16.6.2 UMC EMERGENCY INFORMATION CONTACTS 16 -8 <br />16.6.3 NOTIFICATION PROCEDURE 16 -8 <br />16.7 FIRE PREVENTION & PROTECTION PLAN 16-9 <br />16.7.1 PURPOSE 16 -9 <br />16.7.2 SCOPE 16 -9 <br />16.7.3 TRAINING 16 -10 <br />16.7.4 INSPECTION & MAINTENANCE 16 -10 <br />16.7.5 FIRE PREVENTION 16 -10 <br />16.7.6 CHEMICALS OF CONCERN 16 -12 <br />16.8 ANNUAL TRAINING PROCEDURES 16 -12 <br />Version 1 April 2013 iv <br />