Laserfiche WebLink
The Leadville Mill <br />1.0 INTRODUCTION & BACKGROUND 1 -1 <br />1.1 SITE BACKGROUND 1 -1 <br />1.2 REFERENCES 1 -3 <br />2.0 EXHIBIT A — LEGAL DESCRIPTION & LOCATION MAP (SEC 6.3.1) 2 -1 <br />3.0 EXHIBIT B — SITE DESCRIPTION (SEC 6.3.2) 3 -1 <br />3.1 CLIMATE 3 -1 <br />3.2 REGIONAL GEOLOGIC SETTING 3 -2 <br />3.3 ORE DEPOSITS 3 -3 <br />3.4 SOILS (SEc 6.3.2(A)) 3-4 <br />3.5 VEGETATION (SEC 6.3.2(B)) 3-4 <br />3.6 WILDLIFE (SEC 6.3.2(D)) 3-4 <br />3.7 WATER RESOURCES & HYDROLOGY (SEC 6.3.2(C)) 3 -5 <br />3.8 REFERENCES 3 -6 <br />4.0 EXHIBIT C — MILL PLAN (SEC 6.3.3) 4 - 1 <br />4.1 BACKGROUND 4 -1 <br />4.2 MILL MANAGEMENT ACTIVITIES (SEC 6.3.3(M)) 4 -3 <br />4.2.1 MATERIAL HANDLING 4 -3 <br />4.2.2 DUST CONTROL 4-4 <br />4.2.3 GRINDING CIRCUIT 4-4 <br />4.2.4 FLOTATION CIRCUIT 4 -5 <br />4.2.5 CONCENTRATE CIRCUIT 4 -6 <br />4.2.6 TAILINGS CIRCUIT 4 -7 <br />4.2.7 CHEMICAL REAGENT INVENTORY 4 -7 <br />4.3 TAILINGS STORAGE FACILITY (TSF) <br />4.3.1 <br />4.3.2 <br />4.3.3 <br />4.3.4 <br />4.3.5 <br />4.3.6 <br />4.3.7 <br />4.3.8 <br />4.3.9 <br />TSF CONSTRUCTION PREPARATION <br />SUBGRADE PREPARATION <br />TSF STABILITY & TSF DESIGN <br />GEOSYNTHETIC CLAY LINER <br />LEAK DETECTION SYSTEM <br />POLYPROPYLENE LINER <br />INITIAL TSF LINER STABILIZATION <br />QA/QC <br />CONSTRUCTION SCHEDULE <br />M 1990 -057 <br />TABLE OF CONTENTS <br />TABLE OF CONTENTS <br />4 -8 <br />4 -11 <br />4 -11 <br />4 -12 <br />4 -13 <br />4 -13 <br />4 -14 <br />4 -14 <br />4 -14 <br />4 -18 <br />4.4 ORE STOCKPILES 4 -19 <br />4.5 MILL UTILITIES & SERVICES 4 -19 <br />4.5.1 ELECTRICAL POWER 4 -19 <br />Version 1 April 2013 i <br />