Laserfiche WebLink
11 1 ( ( <br />13.7 <br />28. Y Ac. <br />36.1 <br />/y 3.9 <br />N <br />11.3 <br />h <br />L ,� Legend <br />57.0 c. // <br />L Permit Boundary <br />30 <br />r ?` <br />Ac 4 a Section Line <br />Major Drainage Boundary <br />CA Approximate Flow Lines <br />PD 1 i Stock Tank <br />K CP 1 - 40 SedCad Structure Numbers <br />5.5 A . !Z <br />800 0 800' 1800 <br />CONTOUR INTERVAL 25 Fr. <br />TOPO: PMT TR81 0810 <br />Hydrologic Case - Year 2017 <br />Figure Exh. 7 -14R -2 <br />East Pit Reclamation - Areas <br />SCALE: <br />DATE: <br />DRWG. BY: <br />(:1111 YA V V DRAG NO <br />Colowyo Coal Company <br />smtr wp...r u <br />R- Revised alignment lower portion ESI 09122/10 <br />7 North Trib East Pit ditch 11 3 10 <br />� <br />Revision to SEDCAD Network ESI 12110112 <br />R- ange to Area L ESI 03!26/13 <br />7 Change to Area N,O, i, J, El & E <br />Pacie Exh. 7 -14R -6 <br />N <br />W <br />E <br />I <br />S <br />L ,� Legend <br />57.0 c. // <br />L Permit Boundary <br />30 <br />r ?` <br />Ac 4 a Section Line <br />Major Drainage Boundary <br />CA Approximate Flow Lines <br />PD 1 i Stock Tank <br />K CP 1 - 40 SedCad Structure Numbers <br />5.5 A . !Z <br />800 0 800' 1800 <br />CONTOUR INTERVAL 25 Fr. <br />TOPO: PMT TR81 0810 <br />Hydrologic Case - Year 2017 <br />Figure Exh. 7 -14R -2 <br />East Pit Reclamation - Areas <br />SCALE: <br />DATE: <br />DRWG. BY: <br />(:1111 YA V V DRAG NO <br />Colowyo Coal Company <br />smtr wp...r u <br />R- Revised alignment lower portion ESI 09122/10 <br />7 North Trib East Pit ditch 11 3 10 <br />� <br />Revision to SEDCAD Network ESI 12110112 <br />R- ange to Area L ESI 03!26/13 <br />7 Change to Area N,O, i, J, El & E <br />Pacie Exh. 7 -14R -6 <br />